Difference between revisions of "Coil Test Weekly Meeting 14-Oct-2010"
From GlueXWiki
m |
|||
Line 4: | Line 4: | ||
'''Location and Time''' | '''Location and Time''' | ||
− | * Thu 14-Oct-2010 9: | + | * Thu 14-Oct-2010 9:30 am ARC 428 |
'''Agenda''' | '''Agenda''' | ||
− | * Still more | + | * Still more coil test group members, mainly in consultant/oversight capacity |
** Bill Vulcan | ** Bill Vulcan | ||
* OSP docs and writing assignments - all | * OSP docs and writing assignments - all | ||
− | ** What's left? | + | ** Status |
− | * Technical web page - Mark S | + | ** Split into cryo and electrical |
+ | ** What's left to do? | ||
+ | * Hall D Technical web page - Mark S | ||
* Hall probe with fast readout for detection of turn-to-turn shorts- Mark S | * Hall probe with fast readout for detection of turn-to-turn shorts- Mark S | ||
* Pager for coil test on-call person - Elliott | * Pager for coil test on-call person - Elliott | ||
Line 21: | Line 23: | ||
* Do we need He vessel LHe level in interlock system - George, Elliott | * Do we need He vessel LHe level in interlock system - George, Elliott | ||
** backup to liquid level measurements? | ** backup to liquid level measurements? | ||
− | |||
− | |||
− | |||
− | |||
* Magnet power supply and interlock commissioning - Mark S | * Magnet power supply and interlock commissioning - Mark S | ||
− | ** | + | ** shunt |
− | + | ** ground fault detection | |
− | ** | + | |
* Controls racks - Scot | * Controls racks - Scot | ||
** strain gauge interlock | ** strain gauge interlock | ||
Line 35: | Line 32: | ||
* PLC programming/testing status - Mark W | * PLC programming/testing status - Mark W | ||
** UPS interlock | ** UPS interlock | ||
− | |||
** what's left? | ** what's left? | ||
** backup PLC programmer, file locations, license key | ** backup PLC programmer, file locations, license key | ||
* EPICS <--> PLC communications - Hovanes | * EPICS <--> PLC communications - Hovanes | ||
− | + | ** connection to guard shack and notification conditions | |
− | ** connection to guard shack | + | |
− | + | ||
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | ||
** current status | ** current status | ||
** tutorial? | ** tutorial? | ||
* Coil repair status - George | * Coil repair status - George | ||
− | * Solenoid | + | * Solenoid reviews 25-26 Oct and 7-Dec |
* Preparations for testing next coil - George, Scot, Elliott | * Preparations for testing next coil - George, Scot, Elliott | ||
− | |||
** update P&I | ** update P&I | ||
** splices | ** splices | ||
Line 55: | Line 48: | ||
** downstream yoke spacers | ** downstream yoke spacers | ||
** controls racks rewiring | ** controls racks rewiring | ||
+ | ** what else? |
Revision as of 09:40, 13 October 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 14-Oct-2010 9:30 am ARC 428
Agenda
- Still more coil test group members, mainly in consultant/oversight capacity
- Bill Vulcan
- OSP docs and writing assignments - all
- Status
- Split into cryo and electrical
- What's left to do?
- Hall D Technical web page - Mark S
- Hall probe with fast readout for detection of turn-to-turn shorts- Mark S
- Pager for coil test on-call person - Elliott
- Installation status - all
- what's left?
- when do we give two weeks notice to Errol?
- Do we need He vessel LHe level in interlock system - George, Elliott
- backup to liquid level measurements?
- Magnet power supply and interlock commissioning - Mark S
- shunt
- ground fault detection
- Controls racks - Scot
- strain gauge interlock
- UPS interlock
- anything else?
- PLC programming/testing status - Mark W
- UPS interlock
- what's left?
- backup PLC programmer, file locations, license key
- EPICS <--> PLC communications - Hovanes
- connection to guard shack and notification conditions
- HMI and EWEB programming - Yi, Hovanes
- current status
- tutorial?
- Coil repair status - George
- Solenoid reviews 25-26 Oct and 7-Dec
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- what else?