Difference between revisions of "Coil Test Weekly Meeting 24-Jun-2010"
From GlueXWiki
m |
m |
||
Line 13: | Line 13: | ||
** can we clean out the room? | ** can we clean out the room? | ||
* Safety review - Elliott | * Safety review - Elliott | ||
− | |||
− | + | ** Intro - Tim - 20 mins | |
− | + | *** Introduce the H-D magnet and basic design, purpose of test, what we hope to learn, strategy for obtaining final OSP, etc. | |
− | + | ** Test Plan and Cryo Design - Josh - 30 mins | |
− | *** | + | *** Present magnet test plan and cryogenic design, incl cryo safety design. Mention installation and rigging safety strategy as part of test plan so Tom doesn't need to speak (i.e. we will follow JLab standard guidelines and use HDList). |
− | + | ** Controls Strategy and Design - Elliott - 20 mins | |
− | + | *** Present controls strategy and design, and explain role of PLC in overall safety system (should dual hard-wired safety interlock system be discussed here, or in Cody's talk?) | |
− | + | ** Pressure and Mechanical Design, Magnetic Field Considerations - George - 30 mins | |
− | + | *** Present safety considerations relevant to all pressure and mechanical system, and to magnetic field safety. | |
− | + | ** Magnet Power - Cody - 20 mins | |
− | *** | + | *** Present magnet electrical design and relevant safety systems. |
− | + | ** Tour of F117 and Test Lab - ? | |
− | *** | + | *** Should we schedule this? |
** Writing assignments | ** Writing assignments |
Revision as of 17:18, 23 June 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 24-Jun-2010 9:30am ARC 428
Agenda
- F117 - Elliott, Tom, Scot, Mark S
- schedule for hole in the wall, door, when will we move out?
- can we clean out the room?
- Safety review - Elliott
- Intro - Tim - 20 mins
- Introduce the H-D magnet and basic design, purpose of test, what we hope to learn, strategy for obtaining final OSP, etc.
- Intro - Tim - 20 mins
- Test Plan and Cryo Design - Josh - 30 mins
- Present magnet test plan and cryogenic design, incl cryo safety design. Mention installation and rigging safety strategy as part of test plan so Tom doesn't need to speak (i.e. we will follow JLab standard guidelines and use HDList).
- Test Plan and Cryo Design - Josh - 30 mins
- Controls Strategy and Design - Elliott - 20 mins
- Present controls strategy and design, and explain role of PLC in overall safety system (should dual hard-wired safety interlock system be discussed here, or in Cody's talk?)
- Controls Strategy and Design - Elliott - 20 mins
- Pressure and Mechanical Design, Magnetic Field Considerations - George - 30 mins
- Present safety considerations relevant to all pressure and mechanical system, and to magnetic field safety.
- Pressure and Mechanical Design, Magnetic Field Considerations - George - 30 mins
- Magnet Power - Cody - 20 mins
- Present magnet electrical design and relevant safety systems.
- Magnet Power - Cody - 20 mins
- Tour of F117 and Test Lab - ?
- Should we schedule this?
- Tour of F117 and Test Lab - ?
- Writing assignments
- George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
- Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
- Cody - magnet power (Bill Merz)
- Elliott - controls (Steve L)
- list of previous reviews
- Writing assignments
- Coil test plan - Josh
- Magnet power supply commissioning - Cody
- dump resistor
- B field - George, Mark S
- where to place racks?
- where to plade computers?
- Controls racks - Scot, Mark S, Cody
- internet accessible power strips
- relay cards (for open collector outputs)
- what else is left to do?
- PLC programming/testing status - Mark W
- what can be done while Mark is out of town?
- who else might learn about the Mark's program? Josh? Wesley?
- do we need another A-B programming license?
- EPICS <--> PLC communications - Wesley
- HMI and EWEB programming - Yi, Elliott
- Installation status - George
- Coil repair status - George
- DOE mandated coil replacement plan status - George, Elliott