Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 24-Jun-2010 9:30am ARC 428


Agenda

  • F117 - Elliott, Tom, Scot, Mark S
    • schedule for hole in the wall, door, when will we move out?
    • can we clean out the room?
  • Safety review - Elliott
    • Writing assignments
      • George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
      • Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
      • Cody - magnet power (Bill Merz)
      • Elliott - controls (Steve L)
    • list of previous reviews
    • 1-Jul meeting agenda
      • Intro - Tim - 20 mins
        • Introduce the H-D magnet and basic design, purpose of test, what we hope to learn, strategy for obtaining final OSP, etc.
      • Test Plan and Cryo Design - Josh - 30 mins
        • Present magnet test plan and cryogenic design, incl cryo safety design. Mention installation and rigging safety strategy as part of test plan so Tom doesn't need to speak (i.e. we will follow JLab standard guidelines and use HDList).
      • Controls Strategy and Design - Elliott - 20 mins
        • Present controls strategy and design, and explain role of PLC in overall safety system (should dual hard-wired safety interlock system be discussed here, or in Cody's talk?)
      • Pressure and Mechanical Design, Magnetic Field Considerations - George - 30 mins
        • Present safety considerations relevant to all pressure and mechanical system, and to magnetic field safety.
      • Magnet Power - Cody - 20 mins
        • Present magnet electrical design and relevant safety systems.
      • Tour of F117 and Test Lab - ?
        • Should we schedule this?
  • Coil test plan - Josh
  • Magnet power supply commissioning - Cody
    • dump resistor
  • B field - George, Mark S
    • where to place racks?
    • where to plade computers?
  • Controls racks - Scot, Mark S, Cody
    • internet accessible power strips
    • relay cards (for open collector outputs)
    • what else is left to do?
  • PLC programming/testing status - Mark W
    • what can be done while Mark is out of town?
    • who else might learn about the Mark's program? Josh? Wesley?
    • do we need another A-B programming license?
  • EPICS <--> PLC communications - Wesley
  • HMI and EWEB programming - Yi, Elliott
  • Installation status - George
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott