=Items for followup from previous meeting(s)= | =Items for followup from previous meeting(s)= | ||
# Monitoring | # Monitoring | ||
+ | #* USM: Send drawings of guides to be machined (soon). Send 4 unpolished guides to UofR and 2 unpolished guides to Athens. | ||
#* Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR/UofA). | #* Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR/UofA). | ||
# Fcal | # Fcal | ||
#* Decision on rad hard detectors | #* Decision on rad hard detectors | ||
− | # | + | #* Ashot to send type of Hamamatsu pmt used for PRIMEX |
− | #* | + | #* Elton and Ashot to meet and resolve any discrepancies between the simulations. |
== Discussion of Options for Radiation-Hard Insert == | == Discussion of Options for Radiation-Hard Insert == | ||
Line 24: | Line 25: | ||
# Announcements | # Announcements | ||
+ | # [[FCAL Fabrication Readiness Review]] | ||
# Review of Action Items | # Review of Action Items | ||
# Calibration/Monitoring (Zisis) | # Calibration/Monitoring (Zisis) | ||
# FCAL | # FCAL | ||
## Construction status | ## Construction status | ||
− | + | ## To shashlyk or not to shashlyk. | |
− | ## To shashlyk or not to shashlyk. | + | |
− | + | ||
− | + | ||
# BCAL | # BCAL | ||
− | |||
## Construction Status | ## Construction Status | ||
− | ## | + | ## Fibre QA: [[Media:Shipment11_Npe.png]] and [[Media:Shipment12_Npe.png]] |
− | + | ||
− | + | ||
− | + | ||
# Simulations | # Simulations | ||
# Other Updates | # Other Updates | ||
− | |||
=Minutes= | =Minutes= | ||
− | Attendees: | + | Attendees: Beni, Jim Murphy (EHSQ), Pedro, John, Elton (Jlab); Ryan (IU); Will, Alam (USM); Andrei (UofR). |
+ | |||
+ | # Announcements | ||
+ | # [[FCAL Fabrication Readiness Review]]\ | ||
+ | #* Jim will send us the form that they use to review projects | ||
+ | #* Bruce (Lenzer) asked if they could visit subcontractors | ||
+ | #* Special questions regardind welding of Fcal frame and whether shops were code qualilfied | ||
+ | #* Elton mentioned that following the Readiness Review there will be an approvals for electronics and the support structure, which may be the time that shop qualifications will be verified. | ||
+ | #* Ryan will have the John/Matt post the most up-to-date documents in advance of the Review | ||
+ | # Review of Action Items | ||
+ | #* Will to remind Inaki to send drawings of light guides being produced. | ||
+ | # Calibration/Monitoring (Zisis) | ||
+ | # FCAL | ||
+ | ## Construction status | ||
+ | ## To shashlyk or not to shashlyk. | ||
+ | ##* Radiation damage studies of the Pb glass will likely be repeated at IUCF with a current monitor to check the normalization of doses to the detectors. | ||
+ | # BCAL | ||
+ | ## Construction Status | ||
+ | ##* Module 11 60% complete, Module 12 65% complete | ||
+ | ##* Fiber shipment #13 under test for attenuation lengths | ||
+ | ##* Npe measurements postponed to allow DAQ to be used for test acceptance for gaps between sensor and light guide | ||
+ | ##* Cosmic ray measurements will start soon | ||
+ | ##* Machining of 5-8 is 70% complete at Ross machining | ||
+ | ## Fibre QA: [[Media:Shipment11_Npe.png]] and [[Media:Shipment12_Npe.png]] | ||
+ | ##* Elton noted that exchanges with Kuraray regarding anomalous Kuraray measurements of attenuation for 11 and 12 seem to have found a problem with the Kuraray data. This is being tracked down. | ||
+ | # Simulations | ||
+ | #* Planing for simulations to calculate the energy deposited in cosmic ray setup for a given trigger and geometry. | ||
+ | # USM update | ||
+ | #* 3 light guides completed | ||
+ | #* chiller arrived today | ||
+ | #* Serguei took 2 light guides to CERN to mail to Athens. | ||
+ | #* MOU is getting signatures today. |
Latest revision as of 15:36, 10 June 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Items for followup from previous meeting(s)
- Monitoring
- USM: Send drawings of guides to be machined (soon). Send 4 unpolished guides to UofR and 2 unpolished guides to Athens.
- Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR/UofA).
- Fcal
- Decision on rad hard detectors
- Ashot to send type of Hamamatsu pmt used for PRIMEX
- Elton and Ashot to meet and resolve any discrepancies between the simulations.
Discussion of Options for Radiation-Hard Insert
Options for Radiation-Hard Insert
Tentative Agenda
- Announcements
- FCAL Fabrication Readiness Review
- Review of Action Items
- Calibration/Monitoring (Zisis)
- FCAL
- Construction status
- To shashlyk or not to shashlyk.
- BCAL
- Construction Status
- Fibre QA: Media:Shipment11_Npe.png and Media:Shipment12_Npe.png
- Simulations
- Other Updates
Minutes
Attendees: Beni, Jim Murphy (EHSQ), Pedro, John, Elton (Jlab); Ryan (IU); Will, Alam (USM); Andrei (UofR).
- Announcements
- FCAL Fabrication Readiness Review\
- Jim will send us the form that they use to review projects
- Bruce (Lenzer) asked if they could visit subcontractors
- Special questions regardind welding of Fcal frame and whether shops were code qualilfied
- Elton mentioned that following the Readiness Review there will be an approvals for electronics and the support structure, which may be the time that shop qualifications will be verified.
- Ryan will have the John/Matt post the most up-to-date documents in advance of the Review
- Review of Action Items
- Will to remind Inaki to send drawings of light guides being produced.
- Calibration/Monitoring (Zisis)
- FCAL
- Construction status
- To shashlyk or not to shashlyk.
- Radiation damage studies of the Pb glass will likely be repeated at IUCF with a current monitor to check the normalization of doses to the detectors.
- BCAL
- Construction Status
- Module 11 60% complete, Module 12 65% complete
- Fiber shipment #13 under test for attenuation lengths
- Npe measurements postponed to allow DAQ to be used for test acceptance for gaps between sensor and light guide
- Cosmic ray measurements will start soon
- Machining of 5-8 is 70% complete at Ross machining
- Fibre QA: Media:Shipment11_Npe.png and Media:Shipment12_Npe.png
- Elton noted that exchanges with Kuraray regarding anomalous Kuraray measurements of attenuation for 11 and 12 seem to have found a problem with the Kuraray data. This is being tracked down.
- Construction Status
- Simulations
- Planing for simulations to calculate the energy deposited in cosmic ray setup for a given trigger and geometry.
- USM update
- 3 light guides completed
- chiller arrived today
- Serguei took 2 light guides to CERN to mail to Athens.
- MOU is getting signatures today.