'''Agenda'''
 
'''Agenda'''
  
* When must we vacate F117? by 16-Jul? - Tim, Elliott
+
* F117 status - Tim, Elliott
 +
** when must we vacate? 16-Jul?
 +
** is there enough room now for Fernando et al?
 
* B field - George, Floyd
 
* B field - George, Floyd
** what is field at power supply?
+
** what is field at power supply
 +
*** if too high, move it?  field clamp?
 
** where to place controls racks (may not need RS485)?
 
** where to place controls racks (may not need RS485)?
 +
*** cannot handle high fields
 
** where to place computers?
 
** where to place computers?
** do we need laptops?
+
*** cannot handle high fields
 
* Safety review - Elliott
 
* Safety review - Elliott
 
** 2-Jul meeting date
 
** 2-Jul meeting date
Line 40: Line 44:
 
** dual-monitors
 
** dual-monitors
 
** do we need a printer?
 
** do we need a printer?
 +
** do we need laptops?
 
* Installation status - George
 
* Installation status - George
 
* Coil repair status - George
 
* Coil repair status - George
 
* DOE mandated coil replacement plan status - George, Elliott
 
* DOE mandated coil replacement plan status - George, Elliott

Revision as of 16:19, 8 June 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 10-Jun-2010 9:30am ARC 428


Agenda

  • F117 status - Tim, Elliott
    • when must we vacate? 16-Jul?
    • is there enough room now for Fernando et al?
  • B field - George, Floyd
    • what is field at power supply?
      • if too high, move it? field clamp?
    • where to place controls racks (may not need RS485)?
      • cannot handle high fields
    • where to place computers?
      • cannot handle high fields
  • Safety review - Elliott
    • 2-Jul meeting date
    • 23-Jun deadline submit writing assignments to me (Elton thinks I'll need more time)
    • 25-Jun submit documents to committee
    • writing assignments (SME):
      • George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
      • Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
      • Cody - magnet power (Bill Merz)
      • Elliott - controls (Steve L)
    • also need coil test plan from George and Josh, list of previous reviews
  • Magnet power supply commissioning - Cody
    • dump resistor
    • magnetic field
    • upgrade to higher current
  • EPICS <--> PLC communications - Wesley
  • Final A-B equipment order - Elliott
  • Wiring and testing controls racks - Scot
    • how much testing can be done in F117?
    • how much needs the PLC?
  • PLC programming status - Mark W
    • C-glass calibrations - Elliott
  • HMI and EWEB programming - Yi, Elliott
    • 25 screen limit
    • dual-monitors
    • do we need a printer?
    • do we need laptops?
  • Installation status - George
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott