Difference between revisions of "Nov 3-5, 2009 Calorimetry"
From GlueXWiki
(→Itineraries) |
(→Documents to Review) |
||
Line 46: | Line 46: | ||
= Documents to Review= | = Documents to Review= | ||
+ | # [http://web.me.com/zisis/bcal] Regina Bcal Web Page | ||
+ | # [http://web.me.com/zisis/bcal_reports] Bcal Fabrication Reports | ||
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 13:41, 27 October 2009
BCAL Fabrication Readiness Review
- ESNET and EVO session
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Topics/Issues that need discussion/resolution
- schedule, revision of any milestones based on present projections
- shipping
- handling of crates/number of crates to build
- timing of shipments including considerations of winter weather
- Lessons learned from construction prototype
- Training of personnel, especially transitions between work periods
- testing
- Billing and invoicing guidelines
- JLab:
- Information/feedback required from JLab?
- Plan for storage space at JLab for completed modules
- Plan at JLab for testing of finished modules?
Contract Requirements
- Final Construction Plan
- Final Acceptance Test Plan
- Quality Assurance Plan.
Testing and Tracking: Section 5 of the Statement of Work
Testing
The vendor shall include a draft Acceptance Test Plan with their contract proposal with the final plan to be formally approved by JLab at the Readiness Review. The following items must be included:
- Acceptance of lead sheets upon receipt
- Acceptance of fibers upon receipt
- Acceptance of swaged lead sheets
- Acceptance of fibers during sorting
- Dimensional tests of aluminum base plates
- Dimensional tests of lead-scintillation matrix during stacking
- Acceptance of completed modules based on the following criteria:
- Dimensional testing of modules after machining
- Measurement of light transmission of completed modules.
- Determination of the uniformity of transmission across the face of the BCAL module, e.g. digital photos showing the number of damaged fibers.
- Measurements of the response of a sample of completed modules to cosmic rays.
Tracking
The vendor must keep a record (travelers) of all raw materials and inspections that are used in the construction of each module, and document the procedures followed during fabrication.
Documents to Review
Tentative Agenda
Itineraries
- Elton Smith and Tim Whitlatch:
- Arrive: UA flight 5806 Tue Nov 3 at 03:05 PM.
- Depart: AC flight 1116 Thu Nov 5 at 11:25 AM
- Bruce Lenzer and Michael Martin:
- Arrive: DL flight 2628 Tue Nov 3 at 01:48 PM
- Depart: DL flight 3622 Thu Nov 5 at 06:53 AM