Difference between revisions of "Run Coordination Meetings:Spring2025"

From GlueXWiki
Jump to: navigation, search
m (Beam and Hall configuration)
 
(37 intermediate revisions by 3 users not shown)
Line 40: Line 40:
  
 
==Beam and Hall configuration==
 
==Beam and Hall configuration==
* Commission upgraded ECal.
+
* Commissioning of ECal.
* FCAL commissioning
+
**Other task that can be done if there are pauses in the ECal commissioning
 +
***Diamond alignment (Hovanes)
 +
***...
 +
* Commissioning of FCal.
 
* Experiment: GlueX-II/JEF.
 
* Experiment: GlueX-II/JEF.
 
* Beam energy expected:  
 
* Beam energy expected:  
 
** 12 GeV  
 
** 12 GeV  
 
* Beam polarization expected:  
 
* Beam polarization expected:  
** from 5% to 73%, depending on other passes of the other Halls . 60% or 73% most of the run.     
+
** from 5% to 73%, depending on other passes of the other Halls . No expectation of decent polarization before March 19th. Then 73% for the rest run.     
 
* Solenoid:
 
* Solenoid:
 
**<b>1350A </b>
 
**<b>1350A </b>
Line 54: Line 57:
 
** Chopper slit: <font color="red"> TBD </font>
 
** Chopper slit: <font color="red"> TBD </font>
 
**Standard current and radiators
 
**Standard current and radiators
***~<font color=300 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 400nA on 58 μm diamond))
+
***300 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 400nA on 58 μm diamond))
***~<font color=300 on a 33.7&middot;10<sup>-5</sup> R.L. AL radiator (30 &micro;m Al). (RSAD limit 480nA on 30 &micro;m Al radiator))
+
***300 on a 33.7&middot;10<sup>-5</sup> R.L. AL radiator (30 &micro;m Al). (RSAD limit 480nA on 30 &micro;m Al radiator))
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Radiators:  
 
* Radiators:  
**Goniometer radiators: <font color="red">To be updated</font>
+
**Goniometer radiators: Start with JD70-107. Next, JD70-109. JD70-103 may still be usable if needed. <font color="red">TBD: Install one of the thick 80μm new diamonds, to be available for opportunistic tests.</font>
***Diamond <font color="blue">JD70-103 </font>(50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) Used in CPP. We will start with this diamond
+
***Diamond <font color="blue">JD70-107 </font>(55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) New crystal. (Not expected to be great according to rocking curve.)   
***Diamond <font color="blue">JD70-107 </font>(55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - To be used once JD70-103 becomes deficient. New crystal. (Not expected to be great according to rocking curve.)   
+
***Diamond <font color="blue">JD70-109 </font> (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2; - New crystal - (Not expected to be good according to rocking curve.)
***(Diamond JD70-109 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - New crystal - Not expected to be good according to rocking curve.)
+
***Diamond JD70-103 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) Used in CPP. Partly spent.
***(Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021)
+
 
***(Diamond JD70-106  (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
 
***(Diamond JD70-106  (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
 +
***<s>(Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021) </s>
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***Amorphous  1.86&middot;10<sup>-5</sup> R.L., (for TAC run).
 
***Amorphous  1.86&middot;10<sup>-5</sup> R.L., (for TAC run).
Line 79: Line 82:
 
<!--**<sup>4</sup>He target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]-->
 
<!--**<sup>4</sup>He target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]-->
  
* PS converter:  75 μm <font color="red">To be confirmed</font>
+
* TPol converter:  75 μm  
  
 
* Miscellaneous:
 
* Miscellaneous:
** PS test area (tests will be performed in parallel with GlueX data taking):   
+
** PS test area. Tests must be fully opportunistic,without interfering with ECal commissioning and GlueX data taking. No more than 3 persons involved in such tests should be in the Hall during a control access:   
 
***
 
***
  
Line 90: Line 93:
 
* Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/DRAFT-Updated-Schedule-13Aug2024.xlsx 2025 official schedule (draft)]):
 
* Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/DRAFT-Updated-Schedule-13Aug2024.xlsx 2025 official schedule (draft)]):
 
# January <font color="red">TBD</font>: Electron beam restoration.  
 
# January <font color="red">TBD</font>: Electron beam restoration.  
# January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF.  
+
# January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF. <font color="red">  As of 11/20/24, one or two weeks shift is expected ⇒ January 31st - July 27th: </font>
  
 
* Accelerator overall plan and priorities: Deliver physics beam to 4 halls  
 
* Accelerator overall plan and priorities: Deliver physics beam to 4 halls  
**<font color="red">Anything special for other hall runs?</font>
+
<!-- ** <font color="red">Anything special for other hall runs?</font> -->
  
 
*Hall D plan summary:
 
*Hall D plan summary:
 
** Beam and detector check-out: 50 - 300 nA. ~ a day.  
 
** Beam and detector check-out: 50 - 300 nA. ~ a day.  
** [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning Commission the upgraded ECal] (~ a month. 150 nA)
+
***Commission new beam profiler from Regina (Hovanes).
** Diamond alignment: Stable (no frequent trip) 20 nA without FSD for 2-3 shifts.
+
** [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning Commission of ECal] (~ a month. 150 nA)
 +
***Opportunistic tests during possible pauses of ECAL Commissioning:
 +
****Diamond alignment (Hovanes, see below)
 +
****CDC HV scans (Beni, Naomi). Need compatible trigger
 +
****ToF HV scans (Beni). Need compatible trigger
 +
****Lead glass HV scans (Malte). Need compatible trigger
 +
****Study thick 80μm new diamond (Richard).
 +
**** Others?
 +
** Commissioning of FCal (In parallel with ECal. <font color="red"> Needs a commissioning plan.</font>)
 +
** Diamond alignment: Stable beam (no frequent trip) 20 nA without FSD for 2-3 shifts.
 
**Experiment: GlueX-II/JEF [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 E12-12-002]
 
**Experiment: GlueX-II/JEF [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 E12-12-002]
** <font color="red">TBD</font> TAC runs. ~nA or less. The bleedthrough should be small compare to it.
+
** 2 TAC runs. ~nA or less. The bleedthrough should be small compare to it. 1 run just after ECAL Commissioning. Another near the end of the run.
 +
***Ideally, TAC run should be done with the other Halls off.
 +
***If not possible, the next best option is to have both A and C not at 5 passes, so that magnetic extraction is performed (less bleedthrough than with RF separation).
 +
****Either Hall A or C or both are at 5 passes during the whole run ⇒ we will have to watch for opportunity when the Hall at 5 passes is down.
 
** High luminosity runs: up to 1 week at 650nA, and up to 1 day at 1 uA.
 
** High luminosity runs: up to 1 week at 650nA, and up to 1 day at 1 uA.
** Empty target runs: <font color="red">TBD</font> (300 nA).  
+
** 2 empty target runs (300 nA). 1 run at the start of GlueX-II data taking. Another near the end of the run.
** Straight track run: 2 shifts (50% efficiency: one shift of good data)  (50 nA).
+
** Straight track run: 2 shifts (50% efficiency: one shift of good data)  (50 nA on 10<sup>-4</sup> R.L. radiator).
**<font color="red"> Opportunistic tests?</font>.
+
**Opportunistic tests:
 +
***GEM-TRD test during ECAL Commissioning Positioned 3 to 6 o'clock in front of forward detectors, looking downstream.
  
 
* Expected Staffing and responsibilities:  
 
* Expected Staffing and responsibilities:  
 
**The Run Coordinator oversees the run:  
 
**The Run Coordinator oversees the run:  
*** Jan. ?? - 24, ?? days (beam restoration): Alexandre Deur  
+
*** Jan. ?? - ??, ?? days (beam restoration): Alexandre Deur  
*** Jan. 24 - 29, 6 days: Alexandre Deur  
+
*** <s>Jan. 24 - 29, 6 days: Alexandre Deur </s>
 
*** Jan. 29 - Feb. 5, 1 week: Igal Jaegle
 
*** Jan. 29 - Feb. 5, 1 week: Igal Jaegle
 
*** Feb. 5-12, 1 week:  Simon Taylor
 
*** Feb. 5-12, 1 week:  Simon Taylor
Line 128: Line 144:
 
*** May 21-28, 1 week: Boris Grube
 
*** May 21-28, 1 week: Boris Grube
 
*** May 28-June 4, 1 week: Amy Schertz
 
*** May 28-June 4, 1 week: Amy Schertz
*** June 4-11, 1 week: Naomi Jarvis
+
*** June 4-11, 1 week: Edmundo Barriga
*** June 11-18, 1 week: Edmundo Barriga
+
*** June 11-18, 1 week: Naomi Jarvis
 
*** June 18-25, 1 week: Drew Smith
 
*** June 18-25, 1 week: Drew Smith
 
*** June 25-July 2, 1 week: Hao Li
 
*** June 25-July 2, 1 week: Hao Li
 
*** July 2-9, 1 week: Susan Schandmand
 
*** July 2-9, 1 week: Susan Schandmand
 
*** July 9-16, 1 week: Susan Schandmand
 
*** July 9-16, 1 week: Susan Schandmand
*** July 16-20, 4 days: Mark Dalton
+
*** July 16-23, 1 week: Mark Dalton
 +
*** July 23-30, 1 week: Alexandre Deur
  
 
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (S. Spiegel) verify that the proper safety rules are followed. PDL is:
 
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (S. Spiegel) verify that the proper safety rules are followed. PDL is:
 
***PDL: B.Zihlmann
 
***PDL: B.Zihlmann
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
**Shifts:  2 person shifts:  1 local leader and 1 worker scheduled through [https://www.jlab.org/Hall-D/shifts/index.php the GlueX shift scheduler].
+
**Shifts:  2 person shifts:  1 leader and 1 worker, both on-site, scheduled through [https://www.jlab.org/Hall-D/shifts/index.php the GlueX shift scheduler].
  
 
* Coordination Activities:
 
* Coordination Activities:
Line 279: Line 296:
  
 
==Readiness for Spring 2025 run ==
 
==Readiness for Spring 2025 run ==
<!--(This section is commented out for clarity)
+
<!--(This section is commented out for clarity) -->
<!--(<strike></strike>
+
<!--<strike></strike> -->
*<strike>Solenoid (Tim/Eugene/Beni/Scott):  
+
*Solenoid (Tim/Eugene/Beni/Scott):  
**Turned on fine. </strike>
+
**Solenoid is cold and full with LHe. Power supply and solenoid operation checked out in progress.
 
*Surveys (Tim/Scott)
 
*Surveys (Tim/Scott)
**DIRC (Wednesday 01/11/23)
+
**Surveys yet to be finalized or TBD:
**<strike>CCAL. Will be done after the start of the run during a maintenance day, once CCal is ready.</strike>
+
***ToF
**<strike>Target (Done Friday 01/06/23)</strike>
+
***May need to redo the goniometer survey if we install a 80 μm diamond.
**<strike>Microscope (Fiducialization + final survey: Tuesday 01/10/23)</strike>
+
***PS may need to be redone.
*<strike>DAQ (Sergei). </strike>
+
***DIRC
**<strike>Ready</strike>
+
***Beam pipe
*<strike>Trigger (Alex Somov).</strike>
+
***Luminosity monitor
 +
*DAQ (Sergei).  
 +
**Sergei is reconfiguring the DAQ step by step because the old software is not supported anymore. It should be finished soon.
 +
*Trigger (Alex Somov).
 +
**List of triggers to be used for checkout/tests during ECal commissioning:
 +
***BCAL cosmic M9 and M10  - the sooner, the better
 +
***BCAL_FCAL M9 and M10  - when we have beam. For CDC HV scan (Naomi). As we have not used the CDC for so long, Naomi is concerned that something might have changed in the gas system, particularly the mass flow controllers. ⇒ need to verify that we are getting the intended gas mix as early as possible, so that if there is something wrong, it can be fixed in time.
 
*Beam line  
 
*Beam line  
**<strike>Diamond status (Tim/Hovanes). </strike>
+
**Diamond status (Tim/Hovanes).  
**<strike>Tagger hodoscope (A. Somov).  
+
***Install one of the thick 80μm new diamonds.  
***Powered it and test it Wednesday 01/11/23. Has two bad channels but no plan to fix them for now: we can run that way.</strike>
+
***Remove spent diamond JD70-105 for anneal tests at U.Conn. Richard needs to glue it to its holders. Need to have it before mid-January.
**<strike>Tagger microscope (R. Jones/Igal).
+
***Putting new diamond and/or removing mounted diamond ⇒ re-surveying the goniometer. (Presumably, after mid-January.)
***Reconfiguration is completed. Controller issue with the motor is fixed. Surveys remain to be done.</strike>
+
**<strike>Tagger magnet
**<strike>Goniometer (Hovanes). Motions was tested at the end of the PrimEx run and all is fine.</strike>
+
***Ready and NMR is working.</strike>
**Collimator Motion (Hovanes).
+
**Tagger hodoscope (A. Somov).
**<strike>Active collimator detectors(Richard)
+
**Tagger microscope (R. Jones/Igal).
***Ready. HCO done. </strike>
+
**Goniometer (Hovanes).  
**Profiler (Hovanes)
+
***Removed from beamline and reinstalled ⇒ all diamond alignments will need to be redone.
 +
**<strike>Collimator Motion (Hovanes).
 +
***tested and working</strike>
 +
**Active collimator detectors(Richard)
 +
**<strike>Profiler (Hovanes)
 +
***New profiler (Regina): All tests are fine and surveyed,</strike> but will need to be checked with beam.
 
**Luminosity monitor (=Active Target) (Hovanes).
 
**Luminosity monitor (=Active Target) (Hovanes).
 
**Halo monitors (Hovanes)
 
**Halo monitors (Hovanes)
***Will be re-installed once the beam line is ready
+
**Pair Spectrometer (Alex Somov)  
**<strike>Pair Spectrometer (Alex Somov)  
+
**Polarimeter (Beni/M. Dugger).
***It was check Tuesday 01/10/23 and looks good.</strike>
+
***Detector is operational, Voltages were applied and signals observed. M. Dugger will do a complete checkout Jan 4 to 10.
**<strike>Polarimeter (M. Dugger/Beni/Fernando).  
+
**LH2 Target (Tim/A. Deur)  
***Beni checked the polarimeter and it is operational.</strike>
+
***Surveyed. Target group is working on making electrical powering system compatible with new regulation.
**<strike>LH2 Target (Tim/A. Deur)  
+
**TAC (Alex Somov).
***4He target thermal shield to be removed Wednesday </strike>
+
**<strike>TAC (Alex Somov).
+
***Need to reconnect the detectors. The TAC will NOT be used for TAC runs, unless the CCal is not available. </strike>
+
 
**Slow control (Hovanes).  
 
**Slow control (Hovanes).  
**<strike>RF (Sergei)
+
***Lots of work to be done. Need ECal hardware (temperature sensor, High Voltage equipment) to be finalized before to start Slow Control work on it.
***Checked it Tuesday 01/10/23 at it looks fine.</strike>
+
**RF (Sergei)
**<strike>Radiation monitors (A. Deur)
+
***Need to wait for the cables to be reconnected. Will be checked sometimes in January.  
***Working fine. HCO done</strike>
+
**Radiation monitors (A. Deur)
**<strike>x-ray W shield (Tim/Lubomir/Justin).
+
**<strike>x-ray W shield (Tim).</strike>
***Tim and Justin checked the profiler system to see if one can install an additional W  plate (or thin Pb foil?) on that system. But it turns out to not be a useful option.
+
***Instead, the additional plate can be put in between the primary collimator and the sweeping electromagnet. This option requires access with an ARM for any modification during the run.
+
***Plates are ready.</strike>
+
 
*Detector systems
 
*Detector systems
**<strike>Start Counter (Simon/Joerg/Beni)
+
**Start Counter (Simon/Joerg/Beni)
***Appears to be working fine. HCO done.</strike>
+
***Operational, everything look good.
**<strike>FDC (Lubomir).
+
**FDC (Lubomir).
***Problem with 4 preamps is fixed for now. It was a patchpanel problem.
+
***Chiller is now operational.
***Sergey started cosmics over the night (1/09/23). Data were used to check the FDC/CDC and things are fine.</strike>
+
***At nominal HV, but two sectors are not quite operational. Need to have BCal trigger to test it with cosmics.
**<strike>CDC (Lubomir/Naomi/Beni).
+
**CDC (Lubomir/Naomi/Beni).
***Checked and things are fine</strike>
+
***Looking good so far. Also need to have BCal trigger to test.
**<strike>Gas system (Beni/Lubomir)
+
**Gas system (Beni/Lubomir)
***Will switch the CDC gas system to alcohol on Monday (01/09/23) </strike>
+
***Looking good.
 
**BCal (Mark Dalton/Malte)  
 
**BCal (Mark Dalton/Malte)  
***<strike>Turned on on 01/09/23. Low voltage issue was fixed by Chris S. who change the low voltage board on 01/10/23.  
+
***Waiting on trigger and working DAQ to test.
***Chiller communication issue resolved.</strike>
+
**ECal (Sasha)
 +
*** Two HV distribution panels has been installed [https://logbooks.jlab.org/entry/4323021], two more to come. Checking/fixing modules.
 +
*** For temperature sensors have to be installed (included into the interlock), could run the detector over night after that
 +
*** Including ECAL fan into the interlock (?)
 +
*** Waiting for the trigger firmware
 
**FCal (Malte/Mark Dalton)  
 
**FCal (Malte/Mark Dalton)  
***</strike>Replaced 25 bases. The FCal looks good now.<strike>
+
***Lot of work done since last week. Running it now with LED and cosmics.
***2 FADC modules had a broken input channel. They are on the very edge of FCal, thus not very crucial. One was fixed using a spare. If the repairs of the FADC (W. Gunning) turned out to be relatively easy, we will also fix the other channel. If not, we will run that way, saving spares in case more critical issues arise.  
+
**ToF (Simon/Beni).
***Need to replace another couple of basis.
+
***Installed: requires re-shimming to match the new ECAL/FCAL
**<strike>TOF (Simon/Beni).
+
***Once it is surveyed and cabled (before Christmas in principle), it can be powered and checked out.
***HCO done on the 01/10/23.</strike>
+
***Need to take (non-beam) data to re-calibrate TDC chips. Need to wait for ToF to be cabled. Calibration data taking takes a long time (~week).
 
**DIRC (Justin).
 
**DIRC (Justin).
***<strike>Electronics was checked before the winter break and was found to be fine
+
***Water tank now installed.
***Justin is checking with Chris Stanislav why the LED signals were not seen. This is fixed but the PMTs were not being illuminated in the expected manner. It is now resolved and things look good. Boxes are now filled with water. </strike>
+
 
**Support from Electronic Group (Eugene)
 
**Support from Electronic Group (Eugene)
***Chris Stanislav will be our primary contact until a new hire for the electronic group becomes available. Others (Mark Taylor,...) are being informed so that can supplement Chris.
+
***Do we have a phone number for on-call contact?
***We still need a phone number for on-call contact.
+
*RSAD and ESAD Safety documents (Beni):  
**<strike>Monitoring (Alexander Austregesilo)
+
***ESAD is updated and uploaded to github.
***Ready</strike>
+
***RSAD is prepared by RadCon and out for the required signatures.
*<strike>RSAD and ESAD Safety documents (Lubomir/Beni):  
+
*QUESTION: What equipment should be left on during the Christmas break?
**All documents are ready, signed and in the counting house.
+
**[https://misportal.jlab.org/railsForms/rad_work_permits/144648/briefing Today (01/10/2023 is the last day to read and sign the 2023 General Access Radiation Work Permit (RWP, SAF801kd) before access to the accelerator site is revoked]
+
**[https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-55341 RSAD link]
+
**[https://www.jlab.org/Hall-D/hd_safety.php Hall D safety and training pages, with COVID-19 training requirement]
+
**[https://www.jlab.org/memo/medcon-5-transition-updates MedCon5 page]
+
**[https://www.jlab.org/memo/medcon-5-employeeuser-training-requirements JLab page giving staff and user COVID-19 training requirement]</strike>
+
 
*Phones  
 
*Phones  
**<font color="red">System experts should start looking for their phone and charger.</font>  
+
*Pictures of the Counting Room white board do not update. Sergei and Alexa A. will look into this. (Hovanes knows how to fix this).
 +
<!--**<font color="red">System experts should start looking for their phone and charger.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  
**<font color="red">System experts should start carrying their (charged) phone.</font>  
+
**<font color="red">System experts should start carrying their (charged) phone.</font> -->
 
*Hall Status/safety (Tim/Scott)
 
*Hall Status/safety (Tim/Scott)
*Other topics?-->
+
*Other topics?
  
 
== Live Camera Feeds from the Four Counting Houses ==
 
== Live Camera Feeds from the Four Counting Houses ==
# These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses. <font color="red">(currently this is not working; we should post instructions how to establish this connection. J.R.) </font>
+
# These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.  
 
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
 
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
 +
*Beni will contact Walt Akers to inquire about their status. Done. Walt will take care of it.
  
 
== Running Shifts Remote ==
 
== Running Shifts Remote ==
 
* [[Remote shift concepts]]
 
* [[Remote shift concepts]]
 
<!--::* [https://physdiv.jlab.org/CountingHouses/# Live video feeds to four counting houses]-->
 
<!--::* [https://physdiv.jlab.org/CountingHouses/# Live video feeds to four counting houses]-->

Latest revision as of 08:59, 13 December 2024

Spring 2025 Run

Google Spreadsheet. 


GlueX experiment (January 24 - July 20 2025)


Connect Information

To connect, please see the information on the GlueX meeting wikipage


Meeting General Agenda

Run planning meetings:


Beam and Hall configuration

  • Commissioning of ECal.
    • Other task that can be done if there are pauses in the ECal commissioning
      • Diamond alignment (Hovanes)
      • ...
  • Commissioning of FCal.
  • Experiment: GlueX-II/JEF.
  • Beam energy expected:
    • 12 GeV
  • Beam polarization expected:
    • from 5% to 73%, depending on other passes of the other Halls . No expectation of decent polarization before March 19th. Then 73% for the rest run.
  • Solenoid:
    • 1350A
  • CW Beam:
    • 250 MHz frequency.
    • Range: 1na-1000 nA.
    • Chopper slit: TBD
    • Standard current and radiators
      • 300 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 400nA on 58 μm diamond))
      • 300 on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 480nA on 30 µm Al radiator))
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators: Start with JD70-107. Next, JD70-109. JD70-103 may still be usable if needed. TBD: Install one of the thick 80μm new diamonds, to be available for opportunistic tests.
      • Diamond JD70-107 (55 μm - 4.6·10-4 R.L., 7×7 mm²) New crystal. (Not expected to be great according to rocking curve.)
      • Diamond JD70-109 (50 μm - 4.1·10-4 R.L., 7×7 mm² - New crystal - (Not expected to be good according to rocking curve.)
      • Diamond JD70-103 (50 μm - 4.1·10-4 R.L., 7×7 mm²) Used in CPP. Partly spent.
      • (Diamond JD70-106 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
      • (Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021)
      • Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
      • Amorphous 1.86·10-5 R.L., (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Default running: 5.0 mm.
  • TPol converter: 75 μm
  • Miscellaneous:
    • PS test area. Tests must be fully opportunistic,without interfering with ECal commissioning and GlueX data taking. No more than 3 persons involved in such tests should be in the Hall during a control access:

General Information

This document describes the run plan for the Hall D Spring 2025 run.

  1. January TBD: Electron beam restoration.
  2. January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF. As of 11/20/24, one or two weeks shift is expected ⇒ January 31st - July 27th:
  • Accelerator overall plan and priorities: Deliver physics beam to 4 halls
  • Hall D plan summary:
    • Beam and detector check-out: 50 - 300 nA. ~ a day.
      • Commission new beam profiler from Regina (Hovanes).
    • Commission of ECal (~ a month. 150 nA)
      • Opportunistic tests during possible pauses of ECAL Commissioning:
        • Diamond alignment (Hovanes, see below)
        • CDC HV scans (Beni, Naomi). Need compatible trigger
        • ToF HV scans (Beni). Need compatible trigger
        • Lead glass HV scans (Malte). Need compatible trigger
        • Study thick 80μm new diamond (Richard).
        • Others?
    • Commissioning of FCal (In parallel with ECal. Needs a commissioning plan.)
    • Diamond alignment: Stable beam (no frequent trip) 20 nA without FSD for 2-3 shifts.
    • Experiment: GlueX-II/JEF E12-12-002
    • 2 TAC runs. ~nA or less. The bleedthrough should be small compare to it. 1 run just after ECAL Commissioning. Another near the end of the run.
      • Ideally, TAC run should be done with the other Halls off.
      • If not possible, the next best option is to have both A and C not at 5 passes, so that magnetic extraction is performed (less bleedthrough than with RF separation).
        • Either Hall A or C or both are at 5 passes during the whole run ⇒ we will have to watch for opportunity when the Hall at 5 passes is down.
    • High luminosity runs: up to 1 week at 650nA, and up to 1 day at 1 uA.
    • 2 empty target runs (300 nA). 1 run at the start of GlueX-II data taking. Another near the end of the run.
    • Straight track run: 2 shifts (50% efficiency: one shift of good data) (50 nA on 10-4 R.L. radiator).
    • Opportunistic tests:
      • GEM-TRD test during ECAL Commissioning Positioned 3 to 6 o'clock in front of forward detectors, looking downstream.
  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the run:
      • Jan. ?? - ??, ?? days (beam restoration): Alexandre Deur
      • Jan. 24 - 29, 6 days: Alexandre Deur
      • Jan. 29 - Feb. 5, 1 week: Igal Jaegle
      • Feb. 5-12, 1 week: Simon Taylor
      • Feb. 12-19, 1 week: Edmundo Barriga
      • Feb. 19-26, 1 week: Colin Gleason
      • Feb. 26-March 5, 1 week: Igal Jaegle
      • March 5-12, 1 week: Simon Taylor
      • March 12-19, 1 week: Mike McCaughan
      • March 19-26, 1 week: Drew Smith
      • March 26-Apr. 2, 1 week: Naomi Jarvis
      • Apr. 2-9, 1 week: Boris Grube
      • Apr. 9-16, 1 week: Mark Dalton
      • Apr. 16-23, 1 week: Hao Li
      • Apr. 23-30, 1 week: Mike McCaughan
      • Apr. 30-May 7, 1 week: Alexandre Deur
      • May 7-14, 1 week: Richard Jones
      • May 14-21, 1 week: Justin Stevens
      • May 21-28, 1 week: Boris Grube
      • May 28-June 4, 1 week: Amy Schertz
      • June 4-11, 1 week: Edmundo Barriga
      • June 11-18, 1 week: Naomi Jarvis
      • June 18-25, 1 week: Drew Smith
      • June 25-July 2, 1 week: Hao Li
      • July 2-9, 1 week: Susan Schandmand
      • July 9-16, 1 week: Susan Schandmand
      • July 16-23, 1 week: Mark Dalton
      • July 23-30, 1 week: Alexandre Deur
    • The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (S. Spiegel) verify that the proper safety rules are followed. PDL is:
      • PDL: B.Zihlmann
    • The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
    • Shifts: 2 person shifts: 1 leader and 1 worker, both on-site, scheduled through the GlueX shift scheduler.
  • Coordination Activities:
    • The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
    • Run meetings: broadcasted on Zoom. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.

Runplan

Hall D situation room (current run plan)

Hall D counting room white board


Accelerator status

Hot Checkout

To be completed by TBD

0% ready ; 0% checked ; 100% not ready

Readiness for Spring 2025 run

  • Solenoid (Tim/Eugene/Beni/Scott):
    • Solenoid is cold and full with LHe. Power supply and solenoid operation checked out in progress.
  • Surveys (Tim/Scott)
    • Surveys yet to be finalized or TBD:
      • ToF
      • May need to redo the goniometer survey if we install a 80 μm diamond.
      • PS may need to be redone.
      • DIRC
      • Beam pipe
      • Luminosity monitor
  • DAQ (Sergei).
    • Sergei is reconfiguring the DAQ step by step because the old software is not supported anymore. It should be finished soon.
  • Trigger (Alex Somov).
    • List of triggers to be used for checkout/tests during ECal commissioning:
      • BCAL cosmic M9 and M10 - the sooner, the better
      • BCAL_FCAL M9 and M10 - when we have beam. For CDC HV scan (Naomi). As we have not used the CDC for so long, Naomi is concerned that something might have changed in the gas system, particularly the mass flow controllers. ⇒ need to verify that we are getting the intended gas mix as early as possible, so that if there is something wrong, it can be fixed in time.
  • Beam line
    • Diamond status (Tim/Hovanes).
      • Install one of the thick 80μm new diamonds.
      • Remove spent diamond JD70-105 for anneal tests at U.Conn. Richard needs to glue it to its holders. Need to have it before mid-January.
      • Putting new diamond and/or removing mounted diamond ⇒ re-surveying the goniometer. (Presumably, after mid-January.)
    • Tagger magnet
      • Ready and NMR is working.
    • Tagger hodoscope (A. Somov).
    • Tagger microscope (R. Jones/Igal).
    • Goniometer (Hovanes).
      • Removed from beamline and reinstalled ⇒ all diamond alignments will need to be redone.
    • Collimator Motion (Hovanes).
      • tested and working
    • Active collimator detectors(Richard)
    • Profiler (Hovanes)
      • New profiler (Regina): All tests are fine and surveyed, but will need to be checked with beam.
    • Luminosity monitor (=Active Target) (Hovanes).
    • Halo monitors (Hovanes)
    • Pair Spectrometer (Alex Somov)
    • Polarimeter (Beni/M. Dugger).
      • Detector is operational, Voltages were applied and signals observed. M. Dugger will do a complete checkout Jan 4 to 10.
    • LH2 Target (Tim/A. Deur)
      • Surveyed. Target group is working on making electrical powering system compatible with new regulation.
    • TAC (Alex Somov).
    • Slow control (Hovanes).
      • Lots of work to be done. Need ECal hardware (temperature sensor, High Voltage equipment) to be finalized before to start Slow Control work on it.
    • RF (Sergei)
      • Need to wait for the cables to be reconnected. Will be checked sometimes in January.
    • Radiation monitors (A. Deur)
    • x-ray W shield (Tim).
  • Detector systems
    • Start Counter (Simon/Joerg/Beni)
      • Operational, everything look good.
    • FDC (Lubomir).
      • Chiller is now operational.
      • At nominal HV, but two sectors are not quite operational. Need to have BCal trigger to test it with cosmics.
    • CDC (Lubomir/Naomi/Beni).
      • Looking good so far. Also need to have BCal trigger to test.
    • Gas system (Beni/Lubomir)
      • Looking good.
    • BCal (Mark Dalton/Malte)
      • Waiting on trigger and working DAQ to test.
    • ECal (Sasha)
      • Two HV distribution panels has been installed [1], two more to come. Checking/fixing modules.
      • For temperature sensors have to be installed (included into the interlock), could run the detector over night after that
      • Including ECAL fan into the interlock (?)
      • Waiting for the trigger firmware
    • FCal (Malte/Mark Dalton)
      • Lot of work done since last week. Running it now with LED and cosmics.
    • ToF (Simon/Beni).
      • Installed: requires re-shimming to match the new ECAL/FCAL
      • Once it is surveyed and cabled (before Christmas in principle), it can be powered and checked out.
      • Need to take (non-beam) data to re-calibrate TDC chips. Need to wait for ToF to be cabled. Calibration data taking takes a long time (~week).
    • DIRC (Justin).
      • Water tank now installed.
    • Support from Electronic Group (Eugene)
      • Do we have a phone number for on-call contact?
  • RSAD and ESAD Safety documents (Beni):
      • ESAD is updated and uploaded to github.
      • RSAD is prepared by RadCon and out for the required signatures.
  • QUESTION: What equipment should be left on during the Christmas break?
  • Phones
  • Pictures of the Counting Room white board do not update. Sergei and Alexa A. will look into this. (Hovanes knows how to fix this).
  • Hall Status/safety (Tim/Scott)
  • Other topics?

Live Camera Feeds from the Four Counting Houses

  1. These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
  2. Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
  • Beni will contact Walt Akers to inquire about their status. Done. Walt will take care of it.

Running Shifts Remote