Difference between revisions of "Meetings"
From GlueXWiki
(→Technical and Hardware Meetings) |
(→High Level Meetings) |
||
(13 intermediate revisions by 5 users not shown) | |||
Line 7: | Line 7: | ||
Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)] | Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)] | ||
* [[GlueX-Collaboration-Meetings | GlueX Collaboration Meetings]] | * [[GlueX-Collaboration-Meetings | GlueX Collaboration Meetings]] | ||
− | ** [[GlueX-Collaboration- | + | ** [[GlueX-Collaboration-Sep-2024 | September 2024 Meeting]] |
− | + | ||
* [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]] | * [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]] | ||
* [https://halldweb.jlab.org/wiki-private/index.php/Production_and_Analysis_Working_Group Calibration and Production Meetings (private)] | * [https://halldweb.jlab.org/wiki-private/index.php/Production_and_Analysis_Working_Group Calibration and Production Meetings (private)] | ||
Line 14: | Line 13: | ||
* [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)] | * [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)] | ||
* [https://halldweb.jlab.org/wiki-private/index.php/GlueX_Practice_Talks Practice Talks (private)] | * [https://halldweb.jlab.org/wiki-private/index.php/GlueX_Practice_Talks Practice Talks (private)] | ||
− | + | * [[Run_Coordination_Meetings | Run Coordination]] | |
− | + | ** [[Run Coordination Meetings:Spring2025 | Spring 2025 (GlueX-II)]] | |
− | ** [[ | + | |
* [[GlueX Phase III Planning]] | * [[GlueX Phase III Planning]] | ||
* [[Software Tutorials/Workshops]] | * [[Software Tutorials/Workshops]] | ||
Line 42: | Line 40: | ||
* [[GlueX Upgrade PID Meetings|Detection of Internally Reflected Cherenkov light (DIRC)]] | * [[GlueX Upgrade PID Meetings|Detection of Internally Reflected Cherenkov light (DIRC)]] | ||
* Engineering | * Engineering | ||
+ | ** [[FCAL2 Meetings]] - Final stretch | ||
** [[FCAL 2 Installation Meetings]] | ** [[FCAL 2 Installation Meetings]] | ||
** [[FCAL 2 Design Meetings]] | ** [[FCAL 2 Design Meetings]] | ||
** [[JLAB Engineering Design and Fab meeting]] | ** [[JLAB Engineering Design and Fab meeting]] | ||
− | ** [[KLONG Design Meetings]] | + | ** [[KLONG KPT Design Meetings]] |
** [[KLONG CPS Design Meetings]] | ** [[KLONG CPS Design Meetings]] | ||
* Offline Software | * Offline Software |
Latest revision as of 13:20, 12 December 2024
Contents
High Level Meetings
Technical and Hardware Meetings
Quick Reference: GlueX ZoomGov (private) |
Topical Analysis Meetings
Analysis Working Groups |
Other Meetings and Discussions |
The Archives
Click "expand" to the right to see the archive →
Workshop Archive
- Two-Meson Photoproduction Workshop, September 18, 2019
- Joint GlueX-PANDA Workshop [1] May 3-5, 2019
- HIPS [2] February 6-7, 2017.
- YSTAR Workshop November 16-17, 2016. mini-Proceedings [3].
- The May Physics / Analysis Workshop May 2016.
- Nuclear Photoproduction with GlueX April 28-29, 2016.
- KL Workshop February 1-3, 2016. mini-Proceedings [4].
- Photon-hadron physics with the GlueX detector at JLab (Program) (2008).
Old Meetings Archive
The list below contains bullets and links that have been pruned from the various subcategories above over the years. Many of these items link to a page that has links of agendas from many years ago. If for some reason a particular activity below becomes "reactivated" then please relocate the page from the list below to an appropriate table of active meetings at the top of the page.
- GlueX Meetings from 2000-2007: these are archived on the Hall D web site
- May 2008 Subsystems Review
- GlueX Online Workshop July 2009 at CNU
- 12 GeV Trigger/Online Workshop July 2010 at CNU
- Trigger Electronics Meeting Minutes
- Tracking Meetings - public wiki
- FDC Meetings (Tracking)
- FA125 Meetings (Tracking)
- DC and PID Review
- GlueX Target Meetings
- Solenoid Meetings
- Special meeting on planning for a stable TAC run 4/6/2018
- PID Progress (from 2007 workshop)
- May 2007 PID Workshop
- July 2007 PID Workshop
- GlueX Data Challenge Meetings
- February 2009 Tutorial
- GlueX Calibration Working Group Meetings
- GlueX Analysis Workshop 2013 (Report on the Wokshop)
- GlueX Physics Workshop 2016
- GlueX Containers Meetings
- HDGeant4 Meetings
- GlueX/Hall-D Installation Meetings
- BCAL Installation Schedule
- Geant4 Upgrade Meetings
- FCAl DAQ Meetings
- DIRC Review Meeting
- GlueX Upgrade from 2012
- Electronics Trigger Meetings
- Electronics Workshops/Pre-meetings
- fADC FPGA Programming Meetings
- Connect to Bluejeans Meetings (deprecated)
- GlueX Communications
- JLab Contacts for Meetings
- Transitioning from BlueJeans to Zoom
- Want to connect? Read here first
- Production & Analysis Meetings (old public agendas)
- Physics Simulation Meetings (old)
- Physics Working Group Meetings (old public agendas)
- Eta and Eta-prime and related analyses
- Hyperon Informal Working Group
- Hyperon Working Group (private) inactive: analyses transitioned to other working groups
- Practice Talks (old public page)
- Shift Policy Meetings (2014)
- Ad Hoc Meetings
- PAC39 Preparations
- Calorimetry Archives
- CPP Design Meetings
- Trigger Commissioning Meetings
- Level-3 Trigger Meetings
- Trigger Working Group Meetings
- GlueX/Primex Meetings (old)
- Online Working Group Meetings
- Run Coordination Meetings: Spring 2023 Run (GlueX)
- Run Coordination Meetings: Fall 2022 Run (PrimEx)
- Run Coordination Meetings: Summer 2022 Run
- Run Coordination Meetings: Fall 2021 Run
- Run Coordination Meetings: Summer 2021 Run
- Run Coordination Meetings: Summer 2020 Run
- Run Coordination Meetings: Fall 2019 / Spring 2020 Run
- Run Coordination Meetings: Spring 2019 Run
- Run Coordination Meetings: Fall 2018 Run
- Run Coordination Meetings: Spring 2018 Run
- Run Coordination Meetings: Spring 2017 Run
- Run Coordination Meetings: Fall 2016 Run
- Run Coordination Meetings: Spring 2016 Run
- Run Coordination Meetings: Fall 2015 Run
- Run Coordination Meetings: Spring 2015 run
- Key Performance Parameters
- Post-Thanksgiving Running (Fall 2014)
- Run Coordination Meetings: Fall 2014 run
- Neutral Pion Polarizability Meetings
- TRD from 20016