− | + | '''Preparation of parts for ECAL''' -- Sasha | |
− | + | * - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left | |
− | + | * - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | |
:: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12. | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12. | ||
:: - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week. | :: - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week. | ||
− | + | * - Fix front panel of two LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | |
::: - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables | ::: - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables | ||
− | + | * - LED: Started testing the prototype of the LMS (need to make the detector room light tight) | |
<!-- ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] --> | <!-- ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] --> | ||
− | + | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | |
* Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4316213] | * Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4316213] | ||
:: - need to arrange cables on chains | :: - need to arrange cables on chains |
Revision as of 08:43, 6 September 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
- - HV distribution boards [1][2]
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
- - Fix front panel of two LV distribution boards [3]
- - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
- - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains
- - need to arrange cables on cable trays
- Students -- Sasha
- - Expect one student from Wuhan, waiting for the US visa
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)