Difference between revisions of "JEF meeting, September 6, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 17: | Line 17: | ||
<!-- ** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx] --> | <!-- ** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx] --> | ||
<!-- ** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024] --> | <!-- ** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024] --> | ||
− | ::: - two remaining bundle of cables will be ready in about a week | + | <!-- ::: - two remaining bundle of cables will be ready in about a week --> |
* Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4315279] | * Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4315279] | ||
<!-- ** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667] --> | <!-- ** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667] --> | ||
<!-- ** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759] --> | <!-- ** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759] --> | ||
− | ** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499] | + | <!-- ** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499] --> |
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] |
Revision as of 08:39, 6 September 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
- - Fix front panel of two LV distribution boards [3]
- - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
- - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- Students -- Sasha
- - Expect one student from Wuhan, waiting for the US visa
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation