Difference between revisions of "JEF meeting, September 6, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 29: | Line 29: | ||
** prototype of the ECAL veto counter (?) | ** prototype of the ECAL veto counter (?) | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | * [[File:Sept-6-Status-Update.pdf]] |
Revision as of 07:53, 6 September 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- - two remaining bundle of cables will be ready in about a week
- Installation and testing cables and dividers [7]
- Installation of long signal cables [8]
- Installation LV patch panels and cables [9]
- Installation of optical fibers [10]
- Detector installation page
- Safety briefings
- Students -- Sasha
- - Expect one student from Wuhan, waiting for the US visa
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation
- File:Sept-6-Status-Update.pdf