Difference between revisions of "JEF meeting, July 26, 2024"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ||
− | * ''' | + | * '''Students''' -- Sasha |
− | ** - | + | ** - Expect one student from Wuhan, paperwork is in process. |
− | + | ||
* '''Beam tests with the PS''' | * '''Beam tests with the PS''' | ||
*** measure shower beam profile and reconstruction in the crystal/LG transition region | *** measure shower beam profile and reconstruction in the crystal/LG transition region |
Latest revision as of 09:23, 26 July 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable: Sammy and Mindy have to assemble 10 cables
- - HV distribution boards. Chris has completed the design of the HV distribution boards. We met with Chris, Tim, and Scot regarding location of the boards on the detector frame
- - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Report from students [1]
- Installation of HV cables [2]
- Installation and testing cables and dividers [3]
- Installation of long signal cables [4]
- Installation LV patch panels and cables [5]
- Installation of optical fibers [6]
- Detector installation page
- Safety briefings
- Students -- Sasha
- - Expect one student from Wuhan, paperwork is in process.
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation