(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
m (Minutes)
 
(9 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
=Agenda=
 
=Agenda=
 
*'''Preparation of parts for ECAL''' -- Sasha  
 
*'''Preparation of parts for ECAL''' -- Sasha  
 +
** - HV long cable, 25 ready (out of 36), discussion with the DSG group regarding help (Sammy and Mindy)
 +
** - HV distribution boards: has not yet been designed, need 4 boards (meeting with Scot/Tim regarding installation during next week)
 +
** - LED: prototype board is ready, have to start testing
 
* '''Ongoing projects'''  - All
 
* '''Ongoing projects'''  - All
 +
<!-- **  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] -->
 +
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy
 +
** - [[File:regulators.xlsx]]  Map of dividers with removed regulators
 +
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 +
** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]
 +
***  Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 +
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 +
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4310168][https://logbooks.jlab.org/entry/4312779]
 +
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 +
** Installing LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
 +
** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499]
 +
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 
* '''Summer students''' -- Sasha
 
* '''Summer students''' -- Sasha
 +
** - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
 +
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
 
* '''Beam tests with the PS'''
 
* '''Beam tests with the PS'''
 +
***  measure shower beam profile and reconstruction in the crystal/LG transition region
 +
***  (install prototype with 5x5 PbWO4 modules  + ? LG)
 
* '''Other hardware projects'''
 
* '''Other hardware projects'''
 +
** prototype of the ECAL veto counter (?)
 +
*'''FCAL2 posters for open house'''** [[File:1-OH24-Poster-H-Laveen-revised4.pdf]]
 +
*''' Abstracts for the DNP meeting'''  and proceedings of the CALOR24 conference [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/Abstract-DNP-2024-4.pdf][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/poster_abstract.docx] [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6407]
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''
 +
** Island update [[File:island_jul18.pdf]]
 +
 +
=Minutes=
 +
Attendees: Bill, Laveen, Sasha, Axel, Vlad, Zisis, S.T.
 +
* Paperwork for Wuhan student in progress, expect student to come late September
 +
* New tech working on ECAL project (hv cables)
 +
* Progress on hv distribution board:  final layout
 +
* LED driver board prepared, to be attached on integrating sphere for LMS
 +
* UMass student working on spreadsheet containing divider test results, started by Olivia
 +
* All long signal cables attached to patch panels
 +
* PMT divider installation for upper half starting, plan to test one layer at a time
 +
* 2 abstracts planned for IEEE conference (SiPM prototype, radiation hardness of active PMT base)
 +
* Simon showed latest 2 photon separation studies with MC
 +
** Removed all material except for BCAL+FCAL
 +
** Efficiency for reconstruction 2 photons with large separation in insert ~100%, but still only ~90% in lead glass
 +
*** Some 3 cluster events in lead glass region have 3 distinct cluster as opposed to false splitoffs due to cluster algorithm, but cannot account for full 10% drop for large separations.

Latest revision as of 13:45, 22 July 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable, 25 ready (out of 36), discussion with the DSG group regarding help (Sammy and Mindy)
    • - HV distribution boards: has not yet been designed, need 4 boards (meeting with Scot/Tim regarding installation during next week)
    • - LED: prototype board is ready, have to start testing
  • Ongoing projects - All
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - File:Regulators.xlsx Map of dividers with removed regulators
    • - Testing procedure [1]
    • - All dividers have been fabricated and tested by George [2]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Summer students -- Sasha
    • - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
    • - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • FCAL2 posters for open house** File:1-OH24-Poster-H-Laveen-revised4.pdf
  • Abstracts for the DNP meeting and proceedings of the CALOR24 conference [9][10] [11]
  • Analysis/Simulation

Minutes

Attendees: Bill, Laveen, Sasha, Axel, Vlad, Zisis, S.T.

  • Paperwork for Wuhan student in progress, expect student to come late September
  • New tech working on ECAL project (hv cables)
  • Progress on hv distribution board: final layout
  • LED driver board prepared, to be attached on integrating sphere for LMS
  • UMass student working on spreadsheet containing divider test results, started by Olivia
  • All long signal cables attached to patch panels
  • PMT divider installation for upper half starting, plan to test one layer at a time
  • 2 abstracts planned for IEEE conference (SiPM prototype, radiation hardness of active PMT base)
  • Simon showed latest 2 photon separation studies with MC
    • Removed all material except for BCAL+FCAL
    • Efficiency for reconstruction 2 photons with large separation in insert ~100%, but still only ~90% in lead glass