Difference between revisions of "JEF meeting, June 7, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 18: | Line 18: | ||
*** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) | *** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
− | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/ | + | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4310168] |
** Installation of long signal cables [https://halldweb.jlab.org/wiki/images/6/62/Fcal2_vxs_crates_new.png] | ** Installation of long signal cables [https://halldweb.jlab.org/wiki/images/6/62/Fcal2_vxs_crates_new.png] | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] |
Revision as of 09:08, 7 June 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
- - HV distribution boards: has not yet been designed, need 4 boards
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers Media:lv_distribution.jpg
- - LED: prototype board is ready, have to start testing
- Ongoing projects - All
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - File:Regulators.xlsx Map of dividers with removed regulators
- - Testing procedure [2]
- - All dividers have been fabricated and tested by George [3]
- Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing cables and dividers [4]
- Installation of long signal cables [5]
- Detector installation page
- Summer students -- Sasha
- - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 posters for open house** File:1-OH24-Poster-H-Laveen-revised4.pdf
- Analysis/Simulation