Difference between revisions of "FCAL Installation"

From GlueXWiki
Jump to: navigation, search
 
(26 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
[[Lead glass PMT and dividers]]
 
[[Lead glass PMT and dividers]]
  
<!-- [[Cables and Crates]] -->
 
  
 +
<!-- [[Cables and Crates]] -->
 
[[Rearranging FCAL cables]]
 
[[Rearranging FCAL cables]]
  
 
[[FCAL2 Crates]]
 
[[FCAL2 Crates]]
  
[[Testing of PbWO dividers]]
+
[[Distribution of signals and voltages]]
  
 +
[[Testing and labeling cables]]
  
 +
[[Removing FCAL cables from the detector]]
 +
 +
 +
[[Work space in Hall D]]
 +
 +
 +
[[Stacking FCAL2 modules]]
 +
 +
:: - [https://halldweb.jlab.org/detectors/fcal2/installation/stacking/fcal_insert_map.xlsx Map of installed ECAL modules]
 +
 +
 +
[[Testing ECAL modules]]
 +
 +
[[Testing of PMT dividers]]
 +
 +
[[Installing dividers]]
 +
 +
[[Detector Alignment]]
  
 
[[List of tasks and manpower]]
 
[[List of tasks and manpower]]
 +
 +
[https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 +
:: - [https://halldweb.jlab.org/detectors/fcal2/installation/students_reports_2023 Students reports]
 +
 +
[https://www.flickr.com/photos/jeffersonlab/sets/72177720313495369 Detector Photos]
  
 
=== Usefull links ===
 
=== Usefull links ===

Latest revision as of 18:31, 2 June 2024


Visual inspection of lead glass modules

Repairing of lead glass modules

Lead glass PMT and dividers


Rearranging FCAL cables

FCAL2 Crates

Distribution of signals and voltages

Testing and labeling cables

Removing FCAL cables from the detector


Work space in Hall D


Stacking FCAL2 modules

- Map of installed ECAL modules


Testing ECAL modules

Testing of PMT dividers

Installing dividers

Detector Alignment

List of tasks and manpower

Summer Students (2023)

- Students reports

Detector Photos

Usefull links

HyCal in Hall B

Status of the insert fabrication