Line 31: | Line 31: | ||
** Ethernet switch installed [https://logbooks.jlab.org/entry/4287964] | ** Ethernet switch installed [https://logbooks.jlab.org/entry/4287964] | ||
** Connecting crates to the switch | ** Connecting crates to the switch | ||
+ | ** Preparing for testing installed dividers | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | *** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) |
Revision as of 09:28, 26 April 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: waiting for about 160 cables (will need to test, label, and bundle)
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
- Ongoing projects
- - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [3]
- - Update from Laveen
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - Testing procedure [4]
- - Mindy has finished with preparing all sockets (~1650) !
- - All dividers have been fabricated
- - Need to remove power regulators on about 200 dividers
- - George has tested about 1400 dividers [5].
- - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Submitted ePAS for testing installed dividers
- Installation of the LMS has been completed [6]
- Cable and divider installation [7]
- Install cable bundles on vertical chains
- Sort out dividers, set up jumpers (amplifier/by-pass) a]nd install them.
- Two optical patch panels for the trigger distribution installed (Armen and Mark) [8] [9]
- Ethernet switch installed [10]
- Connecting crates to the switch
- Preparing for testing installed dividers
- Detector installation page
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- exhibit stand (modules, PMTs, etc.)
- Analysis/Simulation
- Update on pi0gg bggen studies [14] -- Stjepan