Difference between revisions of "JEF meeting, October 7, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
− | ** Received | + | ** Received 40 CRYTUR crystals from Physics Division[https://halldweb.jlab.org/wiki-private/index.php/PMT_for_FCAL_insert] |
− | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 717 (10 since last week) ] | |
− | + | *** Available for wrapping: 762 - 717 = 45 | |
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: | + | |
− | *** Available for wrapping: | + | |
*** DSG group continues wrapping | *** DSG group continues wrapping | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] |
Revision as of 08:52, 7 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Received 40 CRYTUR crystals from Physics Division[1]
- Wrapped CRYTUR crystals: 717 (10 since last week)
- Available for wrapping: 762 - 717 = 45
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1247 (25 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 671 CRYTUR, available: 51
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Light Monitoring System -- Arshak