Difference between revisions of "Run Planning Meeting Notes, June 23 - June 29, 2022"
From GlueXWiki
(→Thursday June 23) |
(→Thursday June 23) |
||
Line 16: | Line 16: | ||
#* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data] | #* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data] | ||
#* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low] | #* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low] | ||
− | #* | + | #* Thunderstorms made TAC run impossible. |
+ | #* [https://logbooks.jlab.org/entry/4006090 Sasha configured the trigger for straight track running] | ||
+ | #* Beam back near midnight but ran into DAQ problems. | ||
+ | #* Overnight empty target production | ||
#Shift Summaries | #Shift Summaries | ||
− | #* [https://logbooks.jlab.org/entry/4005862 day] | + | #* [https://logbooks.jlab.org/entry/4005862 day] [https://logbooks.jlab.org/entry/4006016 swing] [https://logbooks.jlab.org/entry/4006118 owl] [https://logbooks.jlab.org/entry/4006219 early riser] |
#Reports | #Reports | ||
#Issues | #Issues | ||
− | #* Tagger NMR | + | #* [https://logbooks.jlab.org/entry/4006157 DAQ crash ROCTRIG2] |
− | #* DIRC sensor | + | #* (Tagger NMR) |
+ | #* DIRC sensor) | ||
#* DAQ livetime | #* DAQ livetime | ||
− | #* Beam position stability | + | #* (Beam position stability) |
− | #* U1-10-TOP MPOD crate | + | #* (U1-10-TOP MPOD crate) |
#Plans | #Plans | ||
#*No beam from 6:30am until sometime after 3pm, power shedding. | #*No beam from 6:30am until sometime after 3pm, power shedding. |
Revision as of 07:19, 23 June 2022
↑ Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday June 23
- Last 24h:
- Inadvertent change to tagger magnet settings backed out
- Target moved out
- Richard took the microscope scan data
- Bleedthrough beam current was very low
- Thunderstorms made TAC run impossible.
- Sasha configured the trigger for straight track running
- Beam back near midnight but ran into DAQ problems.
- Overnight empty target production
- Shift Summaries
- Reports
- Issues
- DAQ crash ROCTRIG2
- (Tagger NMR)
- DIRC sensor)
- DAQ livetime
- (Beam position stability)
- (U1-10-TOP MPOD crate)
- Plans
- No beam from 6:30am until sometime after 3pm, power shedding.
- Walk-through at 11am
- Commissioning steps temporarily postponed:
- Flux optimization/Act .Col. calibration
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.