* Announcements | * Announcements | ||
* Solenoid status | * Solenoid status | ||
− | ** New vacuum pump signal | + | ** New vacuum pump signal and the flow signals for cold leads |
− | + | ||
** Time syncing | ** Time syncing | ||
** Schedule for power up | ** Schedule for power up | ||
− | * FDC chiller regulation and interlocks | + | * FDC chiller regulation and interlocks (Hovanes, Tim) |
− | * FMWPC voltages issues | + | * FMWPC voltages issues (Hovanes) |
* New camera for CPP gas system ([[media:souh_cam_image.gif | south-cam.jlab.org]] ) | * New camera for CPP gas system ([[media:souh_cam_image.gif | south-cam.jlab.org]] ) | ||
− | * | + | * Motorized stage for the beam profiler replacement (Hovanes) |
− | * New vertical stage for the test setup | + | * New vertical stage for the test setup (Tim) |
− | * UPS in the tagger hall | + | * Tagger magnet NMR box (Tim) |
+ | * UPS in the tagger hall (Tim, Hovanes) | ||
* Other items | * Other items | ||
− | |||
==Time/Location== | ==Time/Location== | ||
10:00am Thursday 28-Apr-2022 | 10:00am Thursday 28-Apr-2022 |
Latest revision as of 09:59, 28 April 2022
- Announcements
- Solenoid status
- New vacuum pump signal and the flow signals for cold leads
- Time syncing
- Schedule for power up
- FDC chiller regulation and interlocks (Hovanes, Tim)
- FMWPC voltages issues (Hovanes)
- New camera for CPP gas system ( south-cam.jlab.org )
- Motorized stage for the beam profiler replacement (Hovanes)
- New vertical stage for the test setup (Tim)
- Tagger magnet NMR box (Tim)
- UPS in the tagger hall (Tim, Hovanes)
- Other items
Time/Location
10:00am Thursday 28-Apr-2022