Controls Meeting 28-Apr-2022

From GlueXWiki
Jump to: navigation, search
  • Announcements
  • Solenoid status
    • New vacuum pump signal and the flow signals for cold leads
    • Time syncing
    • Schedule for power up
  • FDC chiller regulation and interlocks (Hovanes, Tim)
  • FMWPC voltages issues (Hovanes)
  • New camera for CPP gas system ( south-cam.jlab.org )
  • Motorized stage for the beam profiler replacement (Hovanes)
  • New vertical stage for the test setup (Tim)
  • Tagger magnet NMR box (Tim)
  • UPS in the tagger hall (Tim, Hovanes)
  • Other items

Time/Location

10:00am Thursday 28-Apr-2022