Difference between revisions of "January 14, 2021 CPP Design Meeting ERR discussion"
From GlueXWiki
(→Agenda) |
(→Minutes and Action Items) |
||
(12 intermediate revisions by 2 users not shown) | |||
Line 7: | Line 7: | ||
== Agenda == | == Agenda == | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/December_17,_2020_CPP_Design_Meeting | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/December_17,_2020_CPP_Design_Meeting | ||
− | * Readiness Review | + | * Readiness Review February 10 |
+ | ** Charge [[Media:HallD_CPP-NPP_charge.pdf]] | ||
+ | ** Agenda? | ||
+ | ** [[CPP and NPP Readiness Review]] | ||
* Schedule | * Schedule | ||
− | [[Media: | + | [[Media:CPP_Schedule_before_primex_v2.pdf]] |
[[Media:CPP_Schedule_after_primex.pdf]] | [[Media:CPP_Schedule_after_primex.pdf]] | ||
− | * Solid Pb target support and installation [[Media: | + | * Solid Pb target support and installation [[Media:CPP_Target_pic.pdf]] |
− | + | ||
− | + | ||
− | + | ||
* Design/Procurement status | * Design/Procurement status | ||
+ | * New Detector position - 3 inches DS to make dark room bigger | ||
* Things to work out | * Things to work out | ||
Line 24: | Line 25: | ||
** Modified US vacuum system | ** Modified US vacuum system | ||
** Solid target installation | ** Solid target installation | ||
+ | ** Documentation for ERR | ||
== Minutes and Action Items == | == Minutes and Action Items == | ||
− | * | + | * ERR discussed - 3 talks to address charge questions |
− | + | ** Decided to use schedule with CPP run first then Primex - keep other as backup | |
− | ** | + | * Target Discussion |
− | + | ** Rory has target from previous experiment we will use (lead) | |
− | + | ** Need manual insertion of lead and empty target with good precision (change 1X per day) | |
− | + | ** Need vacuum right up to target (thin kapton window -125 microns) | |
− | * | + | ** Desire helium bag inside CDC |
− | ** | + | ** Need to develop design for target change out that can be done quickly and precisely |
− | ** | + | ** Target location 64 cm US of existing target (Hall D 1 cm US of 0,0) |
− | + | ** Vacuum system needs to be designed -continue 1.5 inch tube | |
− | ** Need | + | * Need to develop talks for CPP review to address charge |
− | ** | + | * Detector move DS 3 inches to make room in Darkroom for library ladder |
− | ** | + | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | * | + | |
− | * | + | |
− | + | ||
− | * | + | |
− | * | + | |
− | * | + | |
− | * | + |
Latest revision as of 12:46, 28 January 2021
Meeting Time and Place
Thursday Jan 14, 2021, 2pm Bluejeans https://bluejeans.com/465620466
- Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/December_17,_2020_CPP_Design_Meeting
- Readiness Review February 10
- Charge Media:HallD_CPP-NPP_charge.pdf
- Agenda?
- CPP and NPP Readiness Review
- Schedule
Media:CPP_Schedule_before_primex_v2.pdf Media:CPP_Schedule_after_primex.pdf
- Solid Pb target support and installation Media:CPP_Target_pic.pdf
- Design/Procurement status
- New Detector position - 3 inches DS to make dark room bigger
- Things to work out
- Gas line manifold
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
- Modified US vacuum system
- Solid target installation
- Documentation for ERR
Minutes and Action Items
- ERR discussed - 3 talks to address charge questions
- Decided to use schedule with CPP run first then Primex - keep other as backup
- Target Discussion
- Rory has target from previous experiment we will use (lead)
- Need manual insertion of lead and empty target with good precision (change 1X per day)
- Need vacuum right up to target (thin kapton window -125 microns)
- Desire helium bag inside CDC
- Need to develop design for target change out that can be done quickly and precisely
- Target location 64 cm US of existing target (Hall D 1 cm US of 0,0)
- Vacuum system needs to be designed -continue 1.5 inch tube
- Need to develop talks for CPP review to address charge
- Detector move DS 3 inches to make room in Darkroom for library ladder