# at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls. | # at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls. | ||
# food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others. | # food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others. | ||
+ | |||
+ | =Wednesday, September 16 at 8:45= | ||
+ | # Last 48 hours: | ||
+ | #*Production | ||
+ | #*On Monday: | ||
+ | #**Gluex Production from 6am-10am. Then 2h of beam study, | ||
+ | #**Production resumed from noon to 2:20pm when the beam went down due to power supply failure in the injector. When beam came back (6pm), it was used for 5:30h of beam study. | ||
+ | #**Production resumed at 23:30. | ||
+ | #*On Tuesday: | ||
+ | #**Production until 7:45am when South Linac went down due to cryo problem (compressor 4 controller problem in SL CHL). Production resumed at 21:50. Meanwhile Beni did ST efficiency runs and cosmic runs. | ||
+ | #Accesses: | ||
+ | #***Monday 10am: Vladimir Berdnikov (PS area) | ||
+ | #***Monday 10am, tagger vault. Josh F. | ||
+ | #***Monday 4:15pm: Lubomir and Kondo (PS area, 1-2h), to install and check a HV module for the GEM setup. | ||
+ | #***Monday Vladimir and Alex Somov, in the PS area (other side). | ||
+ | # Reports/issues: | ||
+ | #*Solenoid Alarm for Coil 4 vacuum (know problem) [https://logbooks.jlab.org/entry/3849070 Mark S.'s report] [https://logbooks.jlab.org/entry/3849078 Tim's report] | ||
+ | #*[https://logbooks.jlab.org/entry/3848701 Red lines on monitoring plots do not match peaks (Elton)] | ||
+ | #*[https://logbooks.jlab.org/entry/3848404 New PWO crystals installed (A. Somov et al.)] | ||
+ | #*[https://logbooks.jlab.org/entry/3847991 Relative Photon Efficiencies Elton, Alex A.] | ||
+ | # Run plan | ||
+ | #* Continue production runs | ||
+ | #* Friday Sept. 18th, 6am: Hall C pass change from 5 to 1 pass. We should request to run on our own slit. | ||
+ | #*Next RC meetings at 8:30am? | ||
+ | #* Special tasks remaining: | ||
+ | #**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable] | ||
+ | #**Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit. | ||
+ | #**Pair Spec. test. 1h. A. Somov. After the CCal check. | ||
+ | |||
+ | =Monday, September 14 at 8:45= | ||
+ | # Last 72 hours: | ||
+ | #*Production | ||
+ | #*On Friday: | ||
+ | #**After being down since 2am (vacuum issue), the beam came back at 9am and a empty target run started (target was emptied during the beam down time). Beam down after 30min due to NLvacuum issue and 5th pass separator issue. Beam came back at 15:15. Another empty target run (1h+) was taken and then production resumed. | ||
+ | #**During beam down time, Kondo accessed the Hall to install a new power supply for a GEM (PS area). | ||
+ | #*Saturday: production | ||
+ | #**Beam off from 4pm to 6:30pm due to Klystron change. Sergey accessed the Hall for GEM/TRD work. | ||
+ | #*Sunday: | ||
+ | #** Owl, 1am: scheduled Raster test (Richard Jones. Mike McCaughan). Beam went down at 1:12am, (Chopper + 2L13 issues) and the test had to be postponed. Beam came back at about 4pm. | ||
+ | #** swing: A. Somov worked on SRC trigger fine tuning. Started data taking with SRC trigger at 11pm until rather test at 3:45am next day. | ||
+ | #*Monday: | ||
+ | #** [https://logbooks.jlab.org/entry/3847748 Owl, 3:45-5:15am: re-scheduled Raster test (Richard Jones. Mike McCaughan)]. Test was cut short by the PD at 5:15am because it caused too much trip. | ||
+ | #** Back to SRC trigger data taking for 30min (accidentally, but the data is welcome. Run 73141) and then standard production. | ||
+ | # Reports/issues: | ||
+ | #* RCDB/DAQ test (shorten stop run duration.) Dimitri/Sergey. | ||
+ | #* [https://logbooks.jlab.org/entry/3847802 Raster test (Richard, Mike McCaughan)] | ||
+ | #*[https://logbooks.jlab.org/entry/3846185 Ram disk filling (David Lawrence)] | ||
+ | #*[https://logbooks.jlab.org/entry/3846425 RootSpy fails on new run (Mark Dalton)] | ||
+ | # Run plan | ||
+ | #* Continue production runs | ||
+ | #* Monday Sept. 14th: beam study. | ||
+ | #**10am - 11am/noon: beam study (access to hall allowed). | ||
+ | #**11am - 16:15: physics beam. | ||
+ | #**16:15 - 21:15: beam study (access to hall allowed). | ||
+ | #**Access list: | ||
+ | #***10am: Vladimir Berdnikov (PS area, 1h) | ||
+ | #***10am, tagger vault. Josh F. | ||
+ | #***4:15pm: Lubomir and Kondo (PS area, 1-2h), to install and check a HV module for the GEM setup. | ||
+ | #* Friday Sept. 18th, 6am: Hall C pass change from 5 to 1 pass. We should request to run on our own slit. | ||
+ | #* Special tasks remaining: | ||
+ | #**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable] | ||
+ | #**Beam rastering test | ||
+ | #**Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit. | ||
=Friday, September 11 at 8:45= | =Friday, September 11 at 8:45= |
Latest revision as of 09:03, 16 September 2020
<- Back to Run Coordination Meetings:Summer2020
Contents
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Wednesday, September 16 at 8:45
- Last 48 hours:
- Production
- On Monday:
- Gluex Production from 6am-10am. Then 2h of beam study,
- Production resumed from noon to 2:20pm when the beam went down due to power supply failure in the injector. When beam came back (6pm), it was used for 5:30h of beam study.
- Production resumed at 23:30.
- On Tuesday:
- Production until 7:45am when South Linac went down due to cryo problem (compressor 4 controller problem in SL CHL). Production resumed at 21:50. Meanwhile Beni did ST efficiency runs and cosmic runs.
- Accesses:
- Monday 10am: Vladimir Berdnikov (PS area)
- Monday 10am, tagger vault. Josh F.
- Monday 4:15pm: Lubomir and Kondo (PS area, 1-2h), to install and check a HV module for the GEM setup.
- Monday Vladimir and Alex Somov, in the PS area (other side).
- Reports/issues:
- Solenoid Alarm for Coil 4 vacuum (know problem) Mark S.'s report Tim's report
- Red lines on monitoring plots do not match peaks (Elton)
- New PWO crystals installed (A. Somov et al.)
- Relative Photon Efficiencies Elton, Alex A.
- Run plan
- Continue production runs
- Friday Sept. 18th, 6am: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
- Next RC meetings at 8:30am?
- Special tasks remaining:
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
- Pair Spec. test. 1h. A. Somov. After the CCal check.
Monday, September 14 at 8:45
- Last 72 hours:
- Production
- On Friday:
- After being down since 2am (vacuum issue), the beam came back at 9am and a empty target run started (target was emptied during the beam down time). Beam down after 30min due to NLvacuum issue and 5th pass separator issue. Beam came back at 15:15. Another empty target run (1h+) was taken and then production resumed.
- During beam down time, Kondo accessed the Hall to install a new power supply for a GEM (PS area).
- Saturday: production
- Beam off from 4pm to 6:30pm due to Klystron change. Sergey accessed the Hall for GEM/TRD work.
- Sunday:
- Owl, 1am: scheduled Raster test (Richard Jones. Mike McCaughan). Beam went down at 1:12am, (Chopper + 2L13 issues) and the test had to be postponed. Beam came back at about 4pm.
- swing: A. Somov worked on SRC trigger fine tuning. Started data taking with SRC trigger at 11pm until rather test at 3:45am next day.
- Monday:
- Owl, 3:45-5:15am: re-scheduled Raster test (Richard Jones. Mike McCaughan). Test was cut short by the PD at 5:15am because it caused too much trip.
- Back to SRC trigger data taking for 30min (accidentally, but the data is welcome. Run 73141) and then standard production.
- Reports/issues:
- RCDB/DAQ test (shorten stop run duration.) Dimitri/Sergey.
- Raster test (Richard, Mike McCaughan)
- Ram disk filling (David Lawrence)
- RootSpy fails on new run (Mark Dalton)
- Run plan
- Continue production runs
- Monday Sept. 14th: beam study.
- 10am - 11am/noon: beam study (access to hall allowed).
- 11am - 16:15: physics beam.
- 16:15 - 21:15: beam study (access to hall allowed).
- Access list:
- 10am: Vladimir Berdnikov (PS area, 1h)
- 10am, tagger vault. Josh F.
- 4:15pm: Lubomir and Kondo (PS area, 1-2h), to install and check a HV module for the GEM setup.
- Friday Sept. 18th, 6am: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
- Special tasks remaining:
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Beam rastering test
- Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
Friday, September 11 at 8:45
- Last 24 hours:
- Production, but RF recovery+NL troubles+vacuum issue resulted in only about 6h of useable beam.
- Hall accesses by Lubomir (to reset a crate) and Mark D. (to fix non-working BCal pulser) during scheduled beam down time.
- Hall access by Vladimir Berdnikov (PS area) to reinsert crystals and check communication.
- Reports/issues:
- Run plan
- One last empty target run (2h) (current diamond radiator config., 350 nA)
- Continue production runs
- SRC trigger fine tuning + taking data with SRC trigger. 1 shift (Saturday swing). A. Somov
- Monday Sept. 14th: 10am-16:00: 6h of beam study.
- Tuesday Sept. 15th: due to All Hand Meeting at 9am, RC meeting is cancelled (unless something important happens).
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
- Special tasks remaining:
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Beam rastering test
- Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
Thursday, September 10 at 8:45
- Last 24 hours:
- Production, with beam available for most of the day. A lot of beam trips however, which will be taken care of by impromptu RF recovery tomorrow.
- Reports/issues:
- BCal hot channel (Fixed by Sergey)
- New PWO crystals installed
- Waiting for CCAL
- Run plan
- Continue production runs
- Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
- Tuesday Sept. 15th: 3h of beam study expected
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
- Special tasks remaining:
- Beam rastering test
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Empty target run?