Difference between revisions of "Run Planning Meeting Notes, September 10 - 16, 2020"
From GlueXWiki
m (→Thursday, September 10 at 8:45) |
|||
Line 12: | Line 12: | ||
# at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls. | # at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls. | ||
# food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others. | # food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others. | ||
+ | |||
+ | =Friday, September 11 at 8:45= | ||
+ | # Last 24 hours: | ||
+ | |||
+ | # Reports/issues: | ||
+ | #*Hall access by Lubomir during scheduled beam down time. | ||
+ | |||
+ | # Run plan | ||
+ | #* Continue production runs | ||
+ | #* SRC trigger fine tuning. 2h A. Somov | ||
+ | #* Tuesday Sept. 15th: 3h of beam study expected | ||
+ | #* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit. | ||
+ | |||
+ | #* Special tasks remaining: | ||
+ | #**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable] | ||
+ | #**One last empty target run (2h) | ||
+ | #**Beam rastering test | ||
+ | #**Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit. | ||
=Thursday, September 10 at 8:45= | =Thursday, September 10 at 8:45= | ||
Line 17: | Line 35: | ||
# Reports/issues: | # Reports/issues: | ||
− | #*[https://logbooks.jlab.org/entry/3844529 BCal hot channel] | + | #*[https://logbooks.jlab.org/entry/3844529 BCal hot channel] (Fixed by Sergey) |
#*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed] | #*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed] | ||
#*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL] | #*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL] | ||
Line 26: | Line 44: | ||
#* Tuesday Sept. 15th: 3h of beam study expected | #* Tuesday Sept. 15th: 3h of beam study expected | ||
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass | #* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass | ||
+ | |||
#* Special tasks remaining: | #* Special tasks remaining: | ||
#**Beam rastering test | #**Beam rastering test | ||
#**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable] | #**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable] | ||
#**Empty target run? | #**Empty target run? |
Revision as of 09:08, 10 September 2020
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Friday, September 11 at 8:45
- Last 24 hours:
- Reports/issues:
- Hall access by Lubomir during scheduled beam down time.
- Run plan
- Continue production runs
- SRC trigger fine tuning. 2h A. Somov
- Tuesday Sept. 15th: 3h of beam study expected
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
- Special tasks remaining:
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- One last empty target run (2h)
- Beam rastering test
- Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
- Special tasks remaining:
Thursday, September 10 at 8:45
- Last 24 hours:
- Reports/issues:
- BCal hot channel (Fixed by Sergey)
- New PWO crystals installed
- Waiting for CCAL
- Run plan
- Continue production runs
- Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
- Tuesday Sept. 15th: 3h of beam study expected
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
- Special tasks remaining:
- Beam rastering test
- Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
- Empty target run?
- Special tasks remaining: