Difference between revisions of "Run Planning Meeting Notes, September 3 - 9, 2020"
From GlueXWiki
(→Thursday, September 3) |
(→Thursday, September 3) |
||
Line 26: | Line 26: | ||
# Run plan | # Run plan | ||
#* Continue [https://halldweb.jlab.org/wiki/index.php/Summer_2020_DIRC_Commissioning DIRC commissioning] until 6 am tomorrow morning. | #* Continue [https://halldweb.jlab.org/wiki/index.php/Summer_2020_DIRC_Commissioning DIRC commissioning] until 6 am tomorrow morning. | ||
− | #* | + | #* De-installation work from 6 am (will take 2 - 3 hours) |
− | + | #* Resume production runs | |
− | + | ||
− | + | ||
− | #* | + |
Revision as of 07:21, 3 September 2020
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Thursday, September 3
- Last 24 hours:
- Reports/issues:
- RootSpy issues (Resolved)
- Test results of PWO crystals (test 5)
- DAQ issues, random pulser was left on from the CPP run yesterday morning, which was swamping the DAQ with too many triggers
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
- Continue DIRC commissioning until 6 am tomorrow morning.
- De-installation work from 6 am (will take 2 - 3 hours)
- Resume production runs