Difference between revisions of "Run Planning Meeting Notes, August 6 - 12, 2020"
From GlueXWiki
(→Wednesday, August 12) |
(→Wednesday, August 12) |
||
Line 8: | Line 8: | ||
#* TagM card replacements (Richard, Nick, Chris) [https://logbooks.jlab.org/entry/3825006] | #* TagM card replacements (Richard, Nick, Chris) [https://logbooks.jlab.org/entry/3825006] | ||
#* Test crystals installed [https://logbooks.jlab.org/entry/3825078] | #* Test crystals installed [https://logbooks.jlab.org/entry/3825078] | ||
+ | #* Beam tuning throughout the night | ||
#* 8pm: Harp scan attempt, motor stuck [https://logbooks.jlab.org/entry/3825216], [https://logbooks.jlab.org/entry/3825296], done at 10:30pm | #* 8pm: Harp scan attempt, motor stuck [https://logbooks.jlab.org/entry/3825216], [https://logbooks.jlab.org/entry/3825296], done at 10:30pm | ||
#* 2:45am: Harp scan [https://logbooks.jlab.org/entry/3825461] | #* 2:45am: Harp scan [https://logbooks.jlab.org/entry/3825461] |
Revision as of 08:07, 12 August 2020
<- Back to Run Coordination Meetings:Summer2020
Contents
Wednesday, August 12
- Last 24 hours
- Reports/Issues
- DIRC HV off
- Run Plan
- Moving beam spot on diamond during Hovanes' shift
- Production
- Tuesday: Pass change for Hall C ?
- AOB
- Thanks to all on-site and monitoring shift crews, experts on call and everybody working in the hall
- Next RC: Bill Li
Tuesday, August 11
- Last 24 hours
- Reports/Issues
- Monitoring: Beam Properties normalization updated and calibration fixed
- Coherent edge for 45/135: off-centered/nominal beam
- 5C11 position drifts [8]
- Run plan
- Maintenance day (>4h):
- Intervention on TagM (Richard, Nick, Chris)
- Installation of test crystals (Sasha)
- Work on GEM TRD (Lubomir)
- FCal base replacements (Mark)
- Tune beam spot on diamond for 45/135 (Hovanes)?
- Maintenance day (>4h):
Monday, August 10
- Last 72 hours
- Beam returned Saturday 4am
- Harp scan, initially problems with GUI settings
- DAQ/HOSS problems: [9], [10] (Saturday morning)
- Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [11]
- Saturday swing: AC bias testing, [12], status
- MCC confused about FSD trip and goniometer movements: [13]
- Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm
- Harp scan: [14], [15], [16]
- Completed first full cycle of 4 orientations + amorphous
- DAQ problems on Monday morning: [17], [18], log files from moving to tape fill up disk, Sergey will work on a system to prevent this
- Reports/Issues
- Coherent edge for -45/45: [19]
- Problem with trigger rate archiving [20]
- Monitoring: Saturday 5pm, Sunday 5am, Sunday 5pm, Monday 5am
- Run Plan
- Continue production
- Maintenance day on Tuesday:
- Intervention on TagM (Richard, Chris)
- Installation of test crystals (Sasha)
- Work on GEM TRD (Lubomir)
Friday, August 7
- Last 24 hours
- Diamond alignment check (Hovanes)
- Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
- Add screen shots of the coherent edges to logbook
- "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
- Trigger check-out (Sasha)
- TagH and PS HV scan, interrupted by pass change
- Storm, optics tuning, several issues, transformer repair
- No beam since, expected only this afternoon
- Diamond alignment check (Hovanes)
- Reports/Issues
- Remind MCC to put in dumplet when changing radiators
- BCal Pulser?
- Monitoring:
- CPP Status
- Run Plan
- Access?
- Harp Scan
- Complete first production cycle with 350nA
Thursday, August 6
- Last 24 hours
- 5th pass separator problems after thunderstorm in the evening
- Beam recovered around midnight
- Harp scan: results
- Radiation levels checked: similar to spring
- Reports/Issues
- TagM was set to high gain mode during night, saturates, no meaningful data [21]
- Diamond alignment: coherent edge too far off (Beni)
- Bleed through from Hall B
- Run Plan
- Diamond alignment (Hovanes)
- Trigger, PS, TagH check (Sasha)
- Pass change at noon