Difference between revisions of "July 09, 2020 CPP Design Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | = Meeting Time and Place == | + | == Meeting Time and Place == |
Thursday July 09, 2020, 1:30pm | Thursday July 09, 2020, 1:30pm | ||
Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink | Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink | ||
Line 12: | Line 12: | ||
* DIRC installed | * DIRC installed | ||
* Solenoid field at 1350 A | * Solenoid field at 1350 A | ||
− | |||
− | |||
− | |||
− | |||
CPP Test Configuration | CPP Test Configuration | ||
Line 21: | Line 17: | ||
* DIRC removed | * DIRC removed | ||
* Solenoid field at 1350 A (no change) | * Solenoid field at 1350 A (no change) | ||
− | + | ||
− | + | Screenshots of test layout [[media:CPP_Testconfig.jpg]] [[media:CPP_Testconfig2.jpg]] | |
− | + | [[media:CPP_Testconfig3.jpg]] [[media:CPP_Testconfig4.jpg]] | |
− | + | [[media:CPP_Testconfig5.jpg]] [[media:CPP_Testconfig6.jpg]] | |
− | + | ||
− | + | Possible sequence and times | |
− | + | # CPP test DAQ setup: 2 hrs | |
− | + | # Repeat measurement with nominal GlueX configuration: 2 hrs | |
− | + | # Configure experiment for CPP Test: 12 hours max | |
− | + | # Start with no DIRC, no shielding | |
+ | # Take data: 2 hours | ||
+ | # Install Pb shielding: 2 hours | ||
+ | # Take data: 2 hours | ||
+ | # Install 2 Pb shields: 2 hours | ||
+ | # Take data: 2 hours | ||
+ | # Restore nominal GlueX configuration: 4 hours. | ||
Total time = 30 hours | Total time = 30 hours | ||
+ | The DIRC will have to be surveyed following the test. | ||
+ | |||
+ | Note by Elton: An updated schedule can be found in [[CPP Test 2020 - Schedule]] | ||
* Things to work out | * Things to work out | ||
** Gas line manifold | ** Gas line manifold |
Latest revision as of 11:24, 15 July 2020
Meeting Time and Place
Thursday July 09, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink
- Present - Elton, Dave, Bobby, Ilya, Eugene, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_18,_2020_CPP_Design_Meeting
- Upcoming run, possible testschedule Media:CPP_Tests_Aug2020.pdf
Assume that nominal the GlueX configuration consists of
- No Pb shielding
- DIRC installed
- Solenoid field at 1350 A
CPP Test Configuration
- With and without Pb shielding
- DIRC removed
- Solenoid field at 1350 A (no change)
Screenshots of test layout media:CPP_Testconfig.jpg media:CPP_Testconfig2.jpg media:CPP_Testconfig3.jpg media:CPP_Testconfig4.jpg media:CPP_Testconfig5.jpg media:CPP_Testconfig6.jpg
Possible sequence and times
- CPP test DAQ setup: 2 hrs
- Repeat measurement with nominal GlueX configuration: 2 hrs
- Configure experiment for CPP Test: 12 hours max
- Start with no DIRC, no shielding
- Take data: 2 hours
- Install Pb shielding: 2 hours
- Take data: 2 hours
- Install 2 Pb shields: 2 hours
- Take data: 2 hours
- Restore nominal GlueX configuration: 4 hours.
Total time = 30 hours
The DIRC will have to be surveyed following the test.
Note by Elton: An updated schedule can be found in CPP Test 2020 - Schedule
- Things to work out
- Gas line manifold
- Adjustable lead absorber
- Alignment hardware
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Reviewed minutes of last meeting
- Bobby presented the configuration and the process was discussed - generally ok
- Need to add platform to set lead on so 1 person can change it
- Elton will obtain approval from Eugene to procure/build components