*''' Abstracts for the DNP meeting''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/Abstract-DNP-2024-4.pdf][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/poster_abstract.docx] | *''' Abstracts for the DNP meeting''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/Abstract-DNP-2024-4.pdf][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/poster_abstract.docx] | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal, Sasha, Olivia, Shane, Laveen, Bill, Zisis, Stjepan, Jane, S.T. | ||
+ | * Two LV patch panels with connectors have been installed | ||
+ | * Signal patch panel being populated, bottom part of detector almost done, expect to start the upper part the week of 7/8/234 | ||
+ | * Laveen to submit abstract about JEF to DNP | ||
+ | * Abstract for poster for students to be submitted to DNP |
Latest revision as of 08:13, 8 July 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
- - HV distribution boards: has not yet been designed, need 4 boards
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers Media:lv_distribution.jpg
- - LED: prototype board is ready, have to start testing
- Ongoing projects - All
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - File:Regulators.xlsx Map of dividers with removed regulators
- - Testing procedure [2]
- - All dividers have been fabricated and tested by George [3]
- Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Report from students [4]
- Installation and testing cables and dividers [5]
- Installation of signal patch panels [6][7]
- Installation of long signal cables [8]
- Connecting signal cables to patch panels [9]
- Installing LV patch panels and cables [10]
- Installation of optical fibers [11]
- Detector installation page
- Summer students -- Sasha
- - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 posters for open house** File:1-OH24-Poster-H-Laveen-revised4.pdf
- Abstracts for the DNP meeting [12][13]
- Analysis/Simulation
Minutes
Attendees: Igal, Sasha, Olivia, Shane, Laveen, Bill, Zisis, Stjepan, Jane, S.T.
- Two LV patch panels with connectors have been installed
- Signal patch panel being populated, bottom part of detector almost done, expect to start the upper part the week of 7/8/234
- Laveen to submit abstract about JEF to DNP
- Abstract for poster for students to be submitted to DNP