Difference between revisions of "May 22, 2024 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Created page with "<font color=red>Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time </font>''<br> =Connection instructions= [https://halldweb.jlab.org/wiki-private/index.php/Conn...")
 
Line 45: Line 45:
  
 
= Minutes =
 
= Minutes =
''Attendees: ''
+
''Attendees: Mark, Malte, Eugene, Zisis''
 +
 
 +
# Announcements: none
 +
# Past Meeting Minutes: work is ongoing
 +
# Review Action Items: as all coordinators were present and no other members, we decided to review all action items
 +
## [https://halldweb.jlab.org/wiki/index.php/Short_term_CALWG_Items Short term]: There are 2 items left:
 +
### 1 - check with Matt and Kevin
 +
### 2 - Regina will seek to assign someone to take over from Tolga
 +
## [https://halldweb.jlab.org/wiki/index.php/Long_term_items Long Term]: There are 2 items left:
 +
### 1 - Mark did this to a certain level and will assess whether we go to the next step (challenging).  work would start with pull distributions (Simon did this for tracking). Work would be associated with particular physics channels.
 +
### 2 - Mark reported that this is a known issue connected to DAC chips. Sergei scans all channels for such effects. Mark will try to quantify and initiate the repair process. 
 +
## Work packages:
 +
# Detectors
 +
## FCAL/ECAL
 +
## BCAL
 +
# Calibration
 +
# Monitoring
 +
# Reconstruction
 +
# Simulations
 +
# Any other business

Revision as of 18:43, 24 May 2024

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Connect to ZoomGov Meetings

References

  1. FCAL HDFCAL log book
  2. ECAL HDECAL log book
  3. BCAL HDBCAL log book
  4. CCAL HDCCAL log book
  5. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  6. Photon Reconstruction Task Force
  7. BCAL calibration links, 2020, PrimEx, SRC

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
  4. Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Review Action Items
  4. Detectors
    1. FCAL/ECAL
    2. BCAL
  5. Calibration
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business

Minutes

Attendees: Mark, Malte, Eugene, Zisis

  1. Announcements: none
  2. Past Meeting Minutes: work is ongoing
  3. Review Action Items: as all coordinators were present and no other members, we decided to review all action items
    1. Short term: There are 2 items left:
      1. 1 - check with Matt and Kevin
      2. 2 - Regina will seek to assign someone to take over from Tolga
    2. Long Term: There are 2 items left:
      1. 1 - Mark did this to a certain level and will assess whether we go to the next step (challenging). work would start with pull distributions (Simon did this for tracking). Work would be associated with particular physics channels.
      2. 2 - Mark reported that this is a known issue connected to DAC chips. Sergei scans all channels for such effects. Mark will try to quantify and initiate the repair process.
    3. Work packages:
  4. Detectors
    1. FCAL/ECAL
    2. BCAL
  5. Calibration
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business