Summer 2020 TRD/GEM Commissioning
From GlueXWiki
General logbook entries:
- Lubomir's status on 9/1/2020: [1]
Straight-track data
- For alignment of the GEM/TRD we need to acquire production samples with the magnetic field off
- Straight-track sample at the center position with the full GEM readout for tracking and alignment studies
- Runs 72988 - 72992 taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration
- Runs 72993-72995 taken with FCAL_BCAL_PS_m9 configuration
- Logbook entries: initial correlations and comparison with tracks after mapping fix
Full GEM readout: tracking mode
- At least one large dataset will be required with the full readout for tracking and alignment studies with the full solenoid field
- Runs 73011-73013 taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration, old focused trigger
- Runs 73027-73032 taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration, new focused trigger for TRD studies (xenon gas?)
Runs taken with standard FCAL_BCAL_PS_m9 configuration
- 150 nA: Runs 73014-73018
- 250 nA: Runs 73020, 73033
- 350 nA: Runs 73034-73035