Search results

From GlueXWiki
Jump to: navigation, search
  • ...sa, W. Boeglin, C. Hutton, M.M. Ito, M. Kamel, P. Khetarpal, A. LLodra, N. Sandoval, S. Taylor, T. Whitlatch, S. Worthington, C. Yero, B. Zihlmann, "The GlueX .... Semenov, F. Barbosa, E. Chudakov, M.M. Dalton, D. Lawrence, Y. Qiang, N. Sandoval, E.S. Smith, C. Stanislav, J.R. Stevens, S. Taylor, T. Whitlatch, B. Zihlma
    19 KB (2,649 words) - 15:13, 11 July 2023
  • ...ent to the Hall yesterday to go through the Hot Checkout List. He and Nick Sandoval found 3 dead channels. On the scope there is a large DC offset on them; it
    2 KB (284 words) - 14:50, 3 December 2015
  • ...reviewed the [https://logbooks.jlab.org/entry/3369430 log entry from Nick Sandoval]. Mark will follow up with Nick on any new news.
    3 KB (476 words) - 12:38, 14 March 2017
  • The circuit boards for the SiPM read-out have come back and Nick Sandoval has assembled some using the 50 micron SiPM's we have on hand. The plan is
    3 KB (495 words) - 00:14, 1 April 2015
  • Nick Sandoval reported to Mark that the some channels of the boards have been populated a
    3 KB (418 words) - 06:17, 1 April 2015
  • ...activities for readout assemblies (Fernando Barbosa, Chris Stanislav, Nic Sandoval) ...activities for readout assemblies (Fernando Barbosa, Chris Stanislav, Nic Sandoval)
    4 KB (647 words) - 13:14, 14 May 2013
  • We had a wide-ranging discussion of when would be a good time to send Nick Sandoval down to FIU to help set-up the electronics. Fernando proposed September, bu
    3 KB (534 words) - 17:22, 31 March 2015
  • * We discussed when would be a good time for Nick Sandoval to do the initial electronics installation at FIU, as Fernando has proposed ...uction of the SiPM boards will start very soon according to Fernando. Nick Sandoval will be doing the work. They have already done the bias-voltage-requirement
    5 KB (833 words) - 00:14, 1 April 2015
  • Discussions have been going on among Tim, Hussein, Tom Carstens, Nick Sandoval, and Fernando Barbosa on cable routes and needed cable trays. Cables will b
    4 KB (560 words) - 06:17, 1 April 2015
  • ...time for a Readiness Review. We also need to review plans for having Nick Sandoval travel to FIU to set-up the electronics.
    2 KB (386 words) - 17:30, 31 March 2015
  • When the items have been shipped to FIU, Nick Sandoval will go down and help to get the test set-up started. Fernando needs about
    5 KB (859 words) - 22:25, 31 March 2015
  • * June 17: Nick Sandoval to FIU to set-up electronics.
    3 KB (477 words) - 06:26, 1 April 2015
  • ...': Fernando Barbosa, Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Nick Sandoval, Beni Zihlmann
    4 KB (715 words) - 07:03, 1 April 2015
  • * Eric reported that Nick Sandoval has all the cables and the MPOD crated and ready to ship. Nick is still doi ...rface of the SiPM go damaged. Eric has shipped the SiPM board back to Nick Sandoval. Nick will have a look and send back an up-to-date version of the board as
    5 KB (787 words) - 20:23, 31 March 2015
  • * FIU asked about dates for Nick Sandoval's trip to Miami.
    3 KB (492 words) - 00:48, 1 April 2015
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Nick Sandoval, Beni Zihlmann
    3 KB (457 words) - 16:40, 31 March 2015
  • ...ne of the TOF CAEN HV chassis. The entire chassis was not responding. Nick Sandoval and Chris Stanislav narrowed the problem down to a single module in the cha
    2 KB (288 words) - 16:23, 10 November 2017
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Bruce Lenzer, Nick Sandoval, Tim Whitlatch, Beni Zihlmann
    5 KB (799 words) - 17:04, 24 February 2017
  • * Nick Sandoval (Fast Electronics Group)
    2 KB (250 words) - 15:23, 8 August 2014
  • ...g from the ST-3 to the read-out electronics have not been strung yet. Nick Sandoval and Tim Whitlatch have a plan to run them downstairs through the same penet
    3 KB (453 words) - 21:32, 31 March 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)