September 28, 2011 Tracking CDC/FDC

From GlueXWiki
Jump to: navigation, search

Meeting Time and Place

Wednesday September 28, 2011 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Agenda

  1. Announcements
  2. FDC Update logbook
  3. CDC Update


Minutes

Participants: Curtis, Naomi, Eugene, Beni, Simon, Lubomir, Dave, Tim

FDC Update

  1. Four cells installed in the package as of yesterday.
  2. Gas leakage problem in one of the wire frames solved: a bubble in the epoxy that seals the g10 frame with the PCBs made a gas path to the rochacell. Missing section of a trace on a signal channel fixed.
  3. Fifth cell is almost ready. The sixth (last) one will be ready by the end of next week and expect to have it in the package by mid October.

CDC Update

  1. The outer hub is in place in the Al endplate. The CDC will be lowered to horizontal later on today in order to install the other hub and then the gas lines and the outer shell.
  2. Tim said that the Swiss cheeseplate should be delivered in 5 to 6 weeks.
  3. Eugene asked if we would be able to put HV onto some of the wires.
  4. Tim asked us to make sure that our construction documents are up to date.