Wednesday May 28

Last 24h

  • 17.3 hours ABU, 2.5 hours BANU.

Reports

Problems

  • ROCTAGM1 needed to be power cycled to start run, logentry 4384588
  • ROCTRIG2 responsible for failed daq start run, ok after daq restart logentry 4384697
  • ROCFCAL4 needed to be power cycled to start run, logentry 4384701
  • RC should have requested immediate stop/start of new run when half-wave plate changed (Richard)

Plans

  • Opportunistic access during Beam Studies, whenever stable beam conditions not available
  • Otherwise, continue running.


Tuesday May 27

Last 24h

  • 19.0 hours ABU, 2.1 hours BANU.

Reports

Problems

  • Shift crew needs to be regularly reminded to watch for dropping FCAL bases
  • Event viewer does not open, although required to be running on checklist
  • Hall D convergence extrapolation tool needs revision - Richard
  • Raw mode run on Friday seems to have very few hits, trigger issue? - Lubomir

Plans

  • Check the raw mode trigger, then take a new raw mode run

Monday May 26

Last 24h

  • 19.5 hours ABU, 2.3 hours BANU.

Reports

Problems

  • Occasional DAQ hangs (live time drops suddenly to zero) resolved by stop/start of the run.
  • "Save to logbook" button in Rootspy stops working occasionally, requires restart of Rootspy.

Plans

  • No immediate changes foreseen, continue to run.
  • Hall A plans a Moller run mid-day, expect the half-wave plate to be swapped afterward.

Sunday May 25

Last 24h

  • Sasha took the beam for 2.5 hours to study trigger rates vs size of masked zone in ECAL.
  • 18 hours ABU, 3.4 hours BANU including the 2.5 hours for Sasha's trigger studies (could be disputed that this is BANU).

Reports

Problems

  • Only minor -- watch for drift in the coherent edge

Plans

  • No immediate changes foreseen, continue to run.


Saturday May 24

Last 24h

  • Beam available in Hall D starting around 1:00pm.
  • Completed harps scans, 10 minutes of raw data (1.2M events) with regular trigger at 200 nA.
  • Resumed production around 3:00 PM.
  • Total of 11 hours of ABU over last 24 hour period, 1.5 BANU mostly due to planned configuration changes, DAQ freezing.

Reports

Problems

  • Couple of times data taking frozen with Live Time = 0, recovered by restarting DAQ

Plans

  • Continue production
  • Sasha will take < 1hr to study trigger rates vs expanded ECAL trigger masks around beam hole


Friday May 23

Last 24h

  • No beam since Wednesday maintenance period, waiting for repairs in Arc 10, etc. etc.

Reports

Problems

  • Need to understand reasons for decreasing coherent enhancement
  • Need to fix issue with sinusoidal beam current oscillations

Plans

  • When beam returns, harp scans, 10 minutes of raw mode, then back to production
  • Evaluation of ECAL trigger masks


Thursday May 22

Last 24h

  • No beam since shutdown for maintenance Wednesday morning 6:30 am
  • Solenoid ramped down to 800A for cryo work, back at full current by 16:00
  • MCC reported overtemp in Arc 10 magnet at midnight, dropped to Power Permit
  • Beam to Halls A Hall-D Monitoring Plots Run 131645 and B overnight, Hall D is waiting for repairs in Arc 10

Reports

Problems

  • Need to understand and resolve issue with the noisy BCAL fADC module

Plans

  • DC Power team is working on flushing magnets this morning, hoping to begin tuning beam around noon.
  • When beam returns, harp scans, 10 minutes of raw mode, then back to production
  • Evaluation of ECAL trigger masks