November 11, 2019 DIRC

From GlueXWiki
Jump to: navigation, search

Meeting Information

GlueX DIRC Meeting
Monday November 11, 2019
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. All gluing completed last week
  3. North OB assembly and installation (All)
  4. South OB (All)
    • Gluing completed last week, cured over the weekend. Final mirrors taped in place today
    • Silicone seal and mirror box assembly over the next few days
    • Plan installation by the end of the week and survey to follow next week
  5. LED diffuser Update (Bill)
  6. Readout tests (Justin, Bill, All)
    • After mirror boxes are installed with new diffusers we'll retake LED data (maybe this afternoon for North OB)
  7. Fall 2019 Run Plan (All)
  8. Spring 2019 DIRC Commissioning Analysis (All)
    • New production announcement e-mail
      • Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
    • Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
    • New simulation samples (100M events each) should be ready this week. Producing for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors)
    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  9. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  10. Software overview and tasks (All)
  11. AOB