JEF meeting, August 16, 2024
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- - two remaining bundle of cables will be ready in about a week
- Installation and testing cables and dividers [7]
- Installation of long signal cables [8]
- Installation LV patch panels and cables [9]
- Installation of optical fibers [10]
- Detector installation page
- Safety briefings
- Students -- Sasha
- - Expect one student from Wuhan, waiting for the US visa
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation
- Close shower separation studies -- Laveen
- New manpower for the upcoming run and data analysis, -- Liping
Minutes
Attendees: Bill, Laveen, Liping, Jane, Vlad, Sasha, Axel, Susan, Stjepan, S.T.
- Front panel of two LV distribution boards needed to be fixed
- 2 HV cable bundles each containing 9 cables are in Hall, 1 more bundle has been assembled
- Waiting for HV distribution boards, due in ~2 weeks
- 6 PMT divider layers remain to be installed
- Found some common problems: weak solder joints, bad connectors
- One short cable needed to be swapped out
- Added velcro band to connect chains (supporting cables) together
- Laveen presented an update on 2-shower separation studies
- Separation efficiency at small separation distances depends on energy asymmetry of two showers and total energy
- Liping reported that a professor from the China University of Geosciences (Wuhan) is interested in joining GlueX to work on JEF physics
- Vlad pointed out that we need to make sure that the test setup in one arm of the PS setup in the Hall D we have used in the past is restored
- Could use this to measure shower profile + study lead glass-lead tungstate interface with small-scale prototype
- Will need hardware design/CAD drawings for box to contain crystals and lead glass blocks
- Test veto prototype? Thin scintillator paddles with wave-length shifting fibers
- Sasha thinking about run plan for usage of this arm, will work on a wiki page
- Could use this to measure shower profile + study lead glass-lead tungstate interface with small-scale prototype