February 27, 2020 CPP Design Meeting
From GlueXWiki
Meeting Time and Place =
Thursday February 27, 2020, 2pm At Jefferson Lab, room TED 2504
- Present - Elton, Dave, Stephanie, Llya, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_15,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
- Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
- 3D model
- Things to work out
- Determine location of cable trays under platform
- Complete structural analysis
- Develop installation plan
- Determine location of existing feedthru on North side of dark room
Minutes and Action Items
- Go to hall and look at cable tray locations (Stephanie and Tim)
- Take actual dimensions from Muon chamber in hall (Stephanie, Tim)
- Go inside Dark room to verify what exists and has to be moved (Stephanie, Tim)
- Need space for foil box to cover electronics (Rory will send sketch)
- Dave Lawrence will supply sketches of the complete chamber
- Verify dimensions to racks to get rail as close as we can (Stephanie)
- We can use steel encased lead available at the lab for the US plate. 2" lead and 1/4" steel surrounding it.
- Definitely wish to pursue being able to move the CPP with the FCAL platform