Subject: Start Counter Commissioning Plan Date: Fri, 8 Aug 2014 21:19:00 +0000 From: Werner Boeglin <boeglinw@fiu.edu> To: Mark M. Ito <marki@jlab.org> Hi Mark, here is a possible plan for commissioning: After installation - Are all TDC and ADC channels connected - MPOD control working With Cosmic - ADC and TDC histograms filled and displaid for all 30 channels - Verify TDC and ADC spectra with data previously taken at FIU With Beam - raw ADC , TDC spectra. - include tracking information for time propagation correction - determine time difference between RF and start counter (corrected) - optimize time resolution (individual offsets, walk corrections) - determine start counter solid angle coverage. - develop standard calibration and monitoring procedures kind regards Werner