Coil Test Weekly Meeting 3-Dec-2009

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 3-Dec-2009 9:45 am ARC 428


Agenda

  • FastTrack schedule: status of merging two versions - George, Chuck
    • some timelines appear to be out of date
  • Latest coil test schedule - Tom
  • Any news on using QWeak area? - Tom
  • Status of getting bigger door in F117 - Tom
  • Are modifications to the power supply dump resistor wiring needed? - Mark S
  • Do we need a redundant PLC system - Elliott
  • Status of interface to cryo can - George
  • Status of pressure relief system design - George
  • Status of ordering cryo can - George
  • Ordering platform - George
  • Construction/installation sequence drawings - George, Chuck
  • Ordering remaining controls instrumentation and components - Scot, Elliott
  • P&I, controls drawings, narrative - Tom, George, Scot, Mark S, Mark W
  • Begin wiring effort in F117 - Scot
  • PLC programming and testing - Mark W
  • Coil 1 modification and testing - George
  • Coil 2 cost and schedule - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails and transportainer from IUCF - Tom
  • Safety reviews: when to start formal process - George, Elliott
  • 5 G contours - George
  • Chris' group can do CAD rack layout if we wish - Elliott
  • Coil Test Top To-Do items