Coil Test Weekly Meeting 27-May-2010

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 27-May-2010 9:30am ARC 428


Agenda

  • Coil test plan - George, Josh
  • DOE: new soleniod vs new coils and Helium vessels - George
  • Update on safety interlock design - Mark S, Scot
    • changes to fast and slow dump circuits
    • redundancy in power supply overcurrent interlock
  • Update on magnet power supply commissioning - Cody
  • Update on EPICS <--> PLC communications - Wesley
  • Magnetic field near control racks and computers - George
  • Safety review - OSP and COO - Elliott, Josh, Tim
    • meeting with Bob May et al. next week
  • Final (I hope) A-B equipment order - Elliott
    • RS232 module, 4-chan 4-20 mA output module, two carriers
  • Wiring and testing controls racks - Scot
    • how do we test the system in F117?
    • when does the PLC need to move to F117?
    • can Wesley and Cody play a major role in commissioning the control system?
    • can we use the power supply analog current output signal?
  • PLC programming status - Mark W
    • C-glass calibrations - George
  • RS485 vs RS422 - Mark W, Elliott
  • HMI and EWEB programming - Yi, Elliott
    • offsite visibility of EWEB pages
  • Installation status - George
  • Coil repair status - George