Coil Test Weekly Meeting 25-Mar-2011

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

This meeting was canceled!


Location and Time

  • Fri 25-Mar-2011 9:30 am ARC 231

NOTE: we are back to ARC 231 again, hopefully for good!


Agenda

  • Coil 4 removal and Coil 3 repair and installation status
  • Improvements needed for coil 3
    • Danfysik power transistor
    • balancing quench detector given new inductance calculation and tap locations
    • document trip chains
    • trip sequence diagnosis system
    • slow dump still not working
    • new wiring
  • PLC system improvements
    • additional licenses and modules
  • New VME-based fast DAQ system
    • hardware and software requirements
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall