Coil Test Weekly Meeting 17-Dec-2010

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 17-Dec-2010 10 am ARC 428 (later time due to delayed opening due to snow)


Agenda

  • Operational experience - all
    • what worked, what didn't for coil 1?
    • what should we do differently for the next coil?
      • what coil will we test next?
    • what might we consider doing differently in the hall?
    • distinguish between "must haves" vs "should haves" vs "would like to haves"
    • have we documented our experience?
  • Puzzles and problems to be addressed before next coil test
    • improve cryo system
      • cold traps
    • field polarity reversed
    • sub-coil inductances appear to be backwards
    • inductance seen on splices
    • USB device wiring problems
    • other wiring, cable and connector problems
    • total coil inductance disagreement
    • slow dump doesn't work
    • understand fast dump circuit
      • measure fast dump resistances
    • understand Danfysik ramp-down mechanism
    • vapor-cooled lead blockage
      • can anything be done to avoid another one?
    • improve ability to adjust quench detector
    • use new sensor for vapor-cooled lead voltage drop
    • isolation and current-loop readout for critical signals
      • interaction via Zener and Dataforth clipping
    • UPS on Danfysik boards and contactor
    • improve PLC cryo and MPS algorithms (in preparation for non-expert use)
      • simplify many operations
    • improve PLC early problem detection
    • improve PLC cryo control under varying CTF operating conditions
    • add more HMI screens (may need license upgrade)
    • simplify existing screens
    • additional HMI license, get second computer working
    • more pre-defined trend plots
    • did we ever implement guard shack notification?
    • automated elog entries
    • update drawings and documentation
    • where is manpower to make improvements?
    • what else?
  • Coil repair status - George
    • coil 3 at IUCO
    • coil 2 winding supports
    • plans for coil 4
  • Test responsibilities
    • Low power magnet testing 5A, 50A,100A - Elliott
    • High power magnet testing 100-1500A - Elliott
    • Identify possible turn to turn shorts during ramping - Eugene
    • Assess Heim column centering in coil - George
    • Assess Axial column forces - George
    • Estimate LN2 and He heat leak - Jonathan
    • Assess LN2 and LHe thermal siphons - Jonathan
  • Preparations for testing next coil - George, Scot, Elliott
    • ship coil 3 to JLab
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • quench detector
    • connectors
    • what else might be useful?