May 19, 2016 Calorimeter
From GlueXWiki
Back to: Main Page >> Meetings >> Calorimetry_Meetings
Contents
Video Conferencing Information
Meeting Time: 11:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Action Items
References
Tentative Agenda
- Preparation for REST-file production
- Calibration
- FCAL Pi0 Calibration (Adesh)
- BCAL pi0 Calibration (Will)
- Features
- BCAL Point z position algorithm - George
- Efficiency trees
- Calibration
- Future Reconstruction, Simulation and Calibration
- FCAL
- BCAL
- Charged Track clustering (Will)
- Point time algorithm (George)
- BCAL Time (TDC) Calibration (Andrei & Irina)
- Neutron timing and efficiency (Maria)
- Any other business
Attendees
- JLab: Adesh, Jon, Ahmed, Colleen, Tegan, Mark, Elton
- NW: Sean D.
- CMU: Curtis, Will
- Regina: Zisis
- MIT: Maria
- Athens: George, Christina
Minutes
- REST launch
- Calibration
- FCAL Pi0 calibrations ready
- BCAL Pi0 calibrations ready - will do a once over specific to the runs in the initial launch
- BCAL Shower calibrations
- 1 MeV mean walk observed
- 2 MeV Z-position effects
- Compare to simulation (how may pi0 as a function of stuff)
- New features
- Decide to implement changes to DBCALPoint
- Calibration
- Efficiency trees
- Understand from Paul what is desired
- Future Reconstruction, Simulation and Calibration
- FCAL
- Plan to replace bases next month
- One ana gate went bad, suspicious behavior on another. May need to order more (decide in next week)
- Desire to leave FCAL off until 1 month before next running.
- BCAL
- Charged Track clustering - Will has started thought but launch has higher priority.
- Point time algorithm (George) - Will use charged and neutral particles to determine correction parameters for point objects
- BCAL Time (TDC) Calibration] (Andrei & Irina) - Initial results are in the ballpark of expected results. Time-walk is largely corrected.
- Neutron timing and efficiency (Maria) - Neutrons from MC show a long tail when corrected for time of flight.
- FCAL
- Any other business