Difference between revisions of "Tracking-2-23-2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
#* GEM-TRD | #* GEM-TRD | ||
# Tracking | # Tracking | ||
− | #* Ratios of <math>\frac{d\sigma}{dM}</math> for <math>pK^{-}K^{+}</math> production for the different beam times and batches. Ratios are always taken with respect to full 2018-08 data. | + | #* Ratios of <math>\frac{d\sigma}{dM}</math> for <math>pK^{-}K^{+}</math> production for the different beam times and batches. Ratios are always taken with respect to full 2018-08 data.[[File:L1520 cs ratios.pdf]] |
− | [[File:L1520 cs ratios.pdf]] | + | |
# AOB | # AOB | ||
= Minutes = | = Minutes = |
Revision as of 14:27, 21 February 2023
Thu 2/23/2023 2pm
Agenda
- Detector status:
- CDC
- FDC
- GEM-TRD
- Tracking
- Ratios of for production for the different beam times and batches. Ratios are always taken with respect to full 2018-08 data.File:L1520 cs ratios.pdf
- AOB