Tracking-11-10-2022

From GlueXWiki
Revision as of 12:01, 16 November 2022 by Njarvis (Talk | contribs) (Minutes)

Jump to: navigation, search
  1. meeting link to zoomgov
  2. meeting page

Thu 11/10/2022 2pm

Agenda

  1. Detector status:
    • CDC
    • FDC
  2. Tracking
  3. GEM-TRD
  4. Other

Minutes

  1. Raw mode run:
  2. Tungsten shielding:
    • We briefly discussed Sasha's inquiry about possibly removing the tungsten plate for beam systematics tests. This should not pose a problem to the drift chambers at 200nA beam current. However if this goes ahead we should make sure that RoboCDC is switched OFF, as the HVB currents in the CDC would double. The logbook entry from 19 April 2018 about the W plate insertion is at https://logbooks.jlab.org/entry/3563927 't w
  3. New year maintenance:
    • We discussed plans for maintenance during the short break between PrimEx and GlueX. We do not propose to touch the CDC electronics at present. Since another set of channels developed the same kind of problem as I-1 and I-26, where they trip and have to be coaxed very gradually back up to full HV, and these were solved by switching to a different HV module, the leading theory is now that there is some problem with the HV module and probably not with accumulation of debris on the HV boards. Maybe it is overheating.
  4. TRD:
    • Something about Kondo visiting Cern.