Difference between revisions of "Topics for the 2015 Software Review"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 +
# Report on Successful Data Challenges
 +
#* DC1 - December 2012/ January 2013
 +
#** 5 billion Events - OSG, JLab, CMU
 +
#** 1200 Concurrent Jobs at JLab.
 +
#* DC2 - March/April 2014
 +
#** 10 billion events with EM backgrounds included - OSG, JLab, MIT, CMU, FSU
 +
#** 4500 Concurrent Jobs at JLab
 +
#** Well under 0.1% failure rate
 +
#* Stealth Online Data Challenge
 +
#** Running in Fall 2014
 +
#** Full DAQ chain to local raid disk, transfer to tape, and automatic processing from tape.
 +
#** ~500 million events.
 +
#* DC3 - January/February 2015
 +
#** Read data in raw-event format from tape and produce to DST (REST) files.
 +
#** Load up as many JLab cores as possible.
 +
#** Run Multi-threaded jobs
 
* data acquisitions successes
 
* data acquisitions successes
 
** transfer bandwidth
 
** transfer bandwidth

Revision as of 13:09, 17 January 2015

  1. Report on Successful Data Challenges
    • DC1 - December 2012/ January 2013
      • 5 billion Events - OSG, JLab, CMU
      • 1200 Concurrent Jobs at JLab.
    • DC2 - March/April 2014
      • 10 billion events with EM backgrounds included - OSG, JLab, MIT, CMU, FSU
      • 4500 Concurrent Jobs at JLab
      • Well under 0.1% failure rate
    • Stealth Online Data Challenge
      • Running in Fall 2014
      • Full DAQ chain to local raid disk, transfer to tape, and automatic processing from tape.
      • ~500 million events.
    • DC3 - January/February 2015
      • Read data in raw-event format from tape and produce to DST (REST) files.
      • Load up as many JLab cores as possible.
      • Run Multi-threaded jobs
  • data acquisitions successes
    • transfer bandwidth
    • Event rates, how to improve
    • Event sizes, how to improve
    • rosbustness of system
    • Handle corrupted evio data
  • Revist data spreadsheet from a year ago
  • offline monitoring
    • browser
    • analyze data as it appears on the silo
    • reconstruction results
  • calibration committee
    • bi-weekly meeting
    • preliminary list of constants compiled
    • calibration still needs to be regularized
    • calibration database training
  • CCDB successes
    • command line interface
    • SQLite form of database
  • analysis results
    • electron identification in the FCAL.
    • pi0 peak
    • proton id with tof
    • rho meson in pi+ pi-
    • omega meson in pi+ pi- pi0
  • data transfer to CMU via globus Online
  • data management: event store, etc.
  • stealth data challenge on real data