Difference between revisions of "TRD Instructions For Fall 2015 Run"
From GlueXWiki
Line 3: | Line 3: | ||
== TRD run plan == | == TRD run plan == | ||
− | See the run plan for the Fall 2015 run in [http://www.jlab.org/Hall-D/detector/fdc/luke/TRD_plan_fall2015.pdf this pdf]. | + | See the run plan for the Fall 2015 run in [http://www.jlab.org/Hall-D/detector/fdc/luke/TRD_plan_fall2015.pdf this pdf], which includes the various radiator configurations which we will be testing. |
+ | |||
+ | == Before adjusting voltages == | ||
+ | To check or set HV/LV, first ssh into a gluon machine (like gluon30 or gluon29). For example: | ||
+ | ssh hallgw | ||
+ | ssh hdfdcops@gluon30 |
Revision as of 15:11, 1 December 2015
TRD run plan
See the run plan for the Fall 2015 run in this pdf, which includes the various radiator configurations which we will be testing.
Before adjusting voltages
To check or set HV/LV, first ssh into a gluon machine (like gluon30 or gluon29). For example: ssh hallgw ssh hdfdcops@gluon30