Difference between revisions of "Subsystem Review"

From GlueXWiki
Jump to: navigation, search
(Material Prepared for the Review)
Line 29: Line 29:
 
** [http://www.jlab.org/Hall-D/reviews/System_Review_May08/Final_Talks/W10-CODA3.ppt CODA Version 3]
 
** [http://www.jlab.org/Hall-D/reviews/System_Review_May08/Final_Talks/W10-CODA3.ppt CODA Version 3]
 
** [http://www.jlab.org/Hall-D/reviews/System_Review_May08/Final_Talks/W11-Hall%20D%20Integration.pptx Onine System]
 
** [http://www.jlab.org/Hall-D/reviews/System_Review_May08/Final_Talks/W11-Hall%20D%20Integration.pptx Onine System]
 +
 +
== Relevant Wiki Pages ==
 +
* Description [[Superconducting Solenoid]]
 +
* Description [[DAQ/Online/Controls|Trigger/DAQ/Monitoring/Controls]]
 +
* Description [[Engineering]]
 +
* Description [[Electronics]]
 +
* Safety/QA documentation [[ESH&Q]] ?
  
 
==Dry Runs==
 
==Dry Runs==

Revision as of 09:55, 14 May 2008

Hall D Subsystem Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Runs

All Dry runs are in F326/327

  • Wednesday 23rd of April:
    • 8:00am Graham Talk
    • 1:00pm Tim Talk
    • 4:30pm Dave D and Alex S.
  • Thursday 24th of April:
    • 10:00am Fernando Talk
    • 1:00pm Cindy
    • 4:00pm Elliott Talk
  • Tuesday, 29th of April
    • 4:00pm Rebecca
  • Wednesday 30th of April Room A110:
    • 1:00 pm Fernando
    • 4:00 pm Dave D.
  • Thursday 1st of May Room F326/327:
    • 1:00 pm Tim Talk
    • 4:00 pm Elliott
  • Friday 2nd of May Room F326/327:
    • 8:30 am Elke
    • 1:00 pm Graham
    • 2:30 pm Alex S.
  • Monday 5th of May Room F326/327:
    • 9:00 am George