All public logs
From GlueXWiki
Combined display of all available logs of GlueXWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)- 14:19, 21 October 2021 Whitey (Talk | contribs) uploaded File:Cpp stand 5.jpg
- 13:39, 9 September 2021 Whitey (Talk | contribs) uploaded File:Cpp stand 3.jpg
- 13:37, 9 September 2021 Whitey (Talk | contribs) uploaded File:Cpp stand 2.jpg
- 13:37, 9 September 2021 Whitey (Talk | contribs) uploaded File:Cpp stand 1.jpg
- 07:05, 9 September 2021 Whitey (Talk | contribs) uploaded File:Cpp rails.jpg
- 07:03, 9 September 2021 Whitey (Talk | contribs) uploaded File:Cpp steel 3.jpg
- 16:45, 25 August 2021 Whitey (Talk | contribs) uploaded File:Cpp steel.pdf
- 16:43, 25 August 2021 Whitey (Talk | contribs) uploaded File:Cpp stand.pdf
- 16:41, 25 August 2021 Whitey (Talk | contribs) uploaded File:Cpp cutout.pdf
- 15:50, 14 July 2021 Whitey (Talk | contribs) uploaded File:Cpp bolt.pdf
- 15:49, 14 July 2021 Whitey (Talk | contribs) uploaded File:Cpp HVwire.pdf (wire protrusion outside housing)
- 13:59, 1 July 2021 Whitey (Talk | contribs) uploaded File:Mwpc5&6.pdf
- 08:31, 24 June 2021 Whitey (Talk | contribs) uploaded File:KLONG Be target overall.pdf (KLONG overall target dimensions)
- 07:32, 9 June 2021 Whitey (Talk | contribs) uploaded File:KLF2020 Igor.pdf (presentation of KLF)
- 07:29, 9 June 2021 Whitey (Talk | contribs) uploaded File:KLF Conceptual design 2020.pdf
- 09:16, 6 May 2021 Whitey (Talk | contribs) uploaded File:Gas P&ID.pdf (preliminary gas P&ID CPP Ar/CO2)
- 12:34, 24 March 2021 Whitey (Talk | contribs) uploaded File:Lead joint side.pdf (CPP US lead absorber side view)
- 12:34, 24 March 2021 Whitey (Talk | contribs) uploaded File:Lead joints.pdf (cpp US lead absorber)
- 11:10, 18 March 2021 Whitey (Talk | contribs) uploaded File:Microscope Location.pdf
- 13:54, 25 February 2021 Whitey (Talk | contribs) uploaded File:Microscope Move.pdf
- 13:53, 25 February 2021 Whitey (Talk | contribs) uploaded File:CPP ERR Report.pdf
- 14:40, 18 February 2021 Whitey (Talk | contribs) uploaded File:CPP Target Solid support.jpg (target used for Gluex commissioning)
- 14:37, 18 February 2021 Whitey (Talk | contribs) uploaded File:CPP Schedule Resources v2.pdf (design, install schedule with resources)
- 12:43, 28 January 2021 Whitey (Talk | contribs) uploaded File:CPP Target Mech concept.jpg (insertion concept)
- 12:37, 28 January 2021 Whitey (Talk | contribs) uploaded File:CPP Target concept.jpg (sketch of rotating mechanism for target change out)
- 10:44, 14 January 2021 Whitey (Talk | contribs) uploaded File:CPP Schedule before primex v2.pdf
- 17:12, 13 January 2021 Whitey (Talk | contribs) uploaded File:CPP Target pic.pdf (picture of target)
- 14:08, 17 December 2020 Whitey (Talk | contribs) uploaded File:CPP Schedule after primex.pdf (CPP_Schedule_after_primex)
- 14:07, 17 December 2020 Whitey (Talk | contribs) uploaded File:CPP Schedule before primex.pdf (CPP_Schedule_before_primex)
- 18:16, 16 December 2020 Whitey (Talk | contribs) uploaded File:CPP Electronics enclosure.pdf (CPP_Electronics_enclosure)
- 14:51, 3 December 2020 Whitey (Talk | contribs) uploaded File:CPP Schedule.pdf (Install schedule)
- 10:45, 2 September 2020 Whitey (Talk | contribs) uploaded File:COVID-Safety.png
- 08:26, 26 August 2020 Whitey (Talk | contribs) uploaded File:CPP GEM Test install schedule Aug2020.pdf (installation schedule for simultaneous CPP and GEM tests)
- 09:52, 6 August 2020 Whitey (Talk | contribs) uploaded File:CPP Test Install.pdf (CPP summer 2020 test install views)
- 09:46, 30 July 2020 Whitey (Talk | contribs) uploaded File:Safety.pdf (other lab issues)
- 11:24, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig6.jpg (concept for CPP tests summer 2020)
- 11:24, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig5.jpg (concept for CPP tests summer 2020)
- 11:23, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig4.jpg (concept for CPP tests summer 2020)
- 11:23, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig3.jpg (concept for CPP tests summer 2020)
- 11:22, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig2.jpg (concept for CPP tests summer 2020)
- 11:19, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Testconfig.jpg (concept for CPP tests summer 2020)
- 09:27, 10 July 2020 Whitey (Talk | contribs) uploaded File:CPP Tests Aug2020.pdf (duration of tests for august 2020)
- 11:58, 16 June 2020 Whitey (Talk | contribs) uploaded File:CPP Procurement Priorities.pdf
- 11:57, 16 June 2020 Whitey (Talk | contribs) uploaded File:CPP install schedule 2021.pdf (installation spring 2021)
- 11:57, 16 June 2020 Whitey (Talk | contribs) uploaded File:CPP Procurement Priorities.docx (Plan for installing 2021 spring)
- 07:01, 15 June 2020 Whitey (Talk | contribs) uploaded File:Hall D Resumption Schedule.pdf (as of jun 11 2020 MEDCON5)
- 06:29, 8 June 2020 Whitey (Talk | contribs) uploaded File:Hall D Resumption Plan.pdf (HALL D MEDCON5 Operations Resumption Plan)
- 09:20, 7 June 2020 Whitey (Talk | contribs) uploaded File:Hall D Pre-First Tier Tasks.pdf
- 07:50, 7 June 2020 Whitey (Talk | contribs) uploaded File:JLAB COVID-19 OSP.pdf (JLAB COVID_19 OSP)
- 08:47, 22 May 2020 Whitey (Talk | contribs) uploaded File:HallD CH occupancy.jpg (max occupancy during MEDCON5)
- 08:45, 22 May 2020 Whitey (Talk | contribs) uploaded File:HallD CH occupancy.pdf (occupancy levels for hall D counting house during MEDCON5)
- 13:10, 21 May 2020 Whitey (Talk | contribs) uploaded File:CPP Tests.pdf (effort needed to run CPP tests)
- 08:21, 20 May 2020 Whitey (Talk | contribs) uploaded File:Resumption schedule 19may.pdf
- 08:20, 20 May 2020 Whitey (Talk | contribs) uploaded File:D000001804P002 Beam Resumption plan v2.pdf
- 08:08, 20 May 2020 Whitey (Talk | contribs) uploaded File:Physics update 20may.pdf
- 07:18, 18 May 2020 Whitey (Talk | contribs) uploaded File:D000001804P002 Beam Resumption plan.pdf
- 07:22, 15 May 2020 Whitey (Talk | contribs) uploaded File:Beam Resumption plan tw v2.docx (plan to resume physics going into MEDCON5)
- 07:17, 15 May 2020 Whitey (Talk | contribs) uploaded File:Resumption schedule v2.pdf (split into 2 groups)
- 06:45, 13 May 2020 Whitey (Talk | contribs) uploaded File:Beam Resumption plan tw.docx (mark ups)
- 14:43, 12 May 2020 Whitey (Talk | contribs) uploaded File:Physics mtg 12May.png (Rolf's resumption info)
- 07:47, 8 May 2020 Whitey (Talk | contribs) uploaded File:Rolf's guidance.docx
- 07:41, 8 May 2020 Whitey (Talk | contribs) uploaded File:Va metrics for reopening.pdf
- 10:49, 7 May 2020 Whitey (Talk | contribs) uploaded File:Rory's slides.pdf (clearance issues)
- 08:46, 7 May 2020 Whitey (Talk | contribs) uploaded File:CPP Procurement schedule.docx (rough guess at FY2020 procurements)
- 08:34, 7 May 2020 Whitey (Talk | contribs) uploaded File:CPP stand iso.pdf (with adjustments)
- 08:28, 7 May 2020 Whitey (Talk | contribs) uploaded File:CPP install schedule.pdf (preliminary install schedule based on WAG assumptions)
- 07:58, 6 May 2020 Whitey (Talk | contribs) uploaded File:Beam Resumption plan.docx (Mark's written plan for resuming beam operations if needed)
- 07:52, 6 May 2020 Whitey (Talk | contribs) uploaded File:Physics mtg.png (physics senior staff)
- 07:13, 4 May 2020 Whitey (Talk | contribs) uploaded File:Smitty HVAC.png (smitty evaluation of HVAC and COVID-19)
- 07:39, 1 May 2020 Whitey (Talk | contribs) uploaded File:Accelerator return plan.pdf (accel plan if we run beam this summer)
- 13:07, 23 April 2020 Whitey (Talk | contribs) uploaded File:Rory's screen shots.pdf (screenshots for dicussion)
- 06:45, 22 April 2020 Whitey (Talk | contribs) uploaded File:Mark's return plan.pdf (1st cut of plan to bring hall back to beam operations)
- 14:13, 21 April 2020 Whitey (Talk | contribs) uploaded File:Rolf's notes.jpg (Rolf's notes from this week)
- 14:10, 21 April 2020 Whitey (Talk | contribs) uploaded File:Smitty's take.jpg (brief by Dr. Chandler on his opinions)
- 08:22, 17 April 2020 Whitey (Talk | contribs) uploaded File:MEDCON6 Return-plan.pdf (preliminary return plan from accelerator mtg)
- 08:10, 17 April 2020 Whitey (Talk | contribs) uploaded File:Reopen-plan.pdf (fed plan)
- 06:34, 8 April 2020 Whitey (Talk | contribs) uploaded File:Training online.pdf (available online training to JLAB employees)
- 06:23, 8 April 2020 Whitey (Talk | contribs) uploaded File:Training.pdf (possible training sources)
- 12:49, 2 April 2020 Whitey (Talk | contribs) uploaded File:Muon Chamber dimensions.pdf (Rory's picture with dimensions)
- 09:09, 2 April 2020 Whitey (Talk | contribs) uploaded File:Muon Chamber Shielding.pdf (Rory's description of electronics shielding and grounding)
- 14:13, 7 February 2020 Whitey (Talk | contribs) uploaded File:Alarm.pdf (DIRC Alarms)
- 14:02, 7 February 2020 Whitey (Talk | contribs) uploaded File:TaggerVac.png (Tagger turbo excursion)
- 15:24, 30 January 2020 Whitey (Talk | contribs) uploaded File:G10 PMT Capture plate.pdf (G10)
- 15:23, 30 January 2020 Whitey (Talk | contribs) uploaded File:Jacking plate.pdf (brass)
- 15:23, 30 January 2020 Whitey (Talk | contribs) uploaded File:Upstream plate.pdf (brass module plate)
- 10:33, 15 January 2020 Whitey (Talk | contribs) uploaded File:CPP Installation Concept.pdf (concept for installing CPP detector partially inside the FCAL dark room)
- 14:54, 10 January 2020 Whitey (Talk | contribs) uploaded File:FCAL2 cross section.jpg (section)
- 16:22, 9 December 2019 Whitey (Talk | contribs) uploaded File:FCAL Insert Module installation procedure.pdf (preliminary assembly sequence for the FCAL insert)
- 14:16, 6 December 2019 Whitey (Talk | contribs) uploaded File:CPP Concept.pdf (sketch of CPP concept incursion on FCAL darkroom)
- 14:03, 6 December 2019 Whitey (Talk | contribs) uploaded File:Accel schedule.pdf (2019-2020)
- 12:31, 28 October 2019 Whitey (Talk | contribs) uploaded File:Module installation procedure.pdf (Preliminary procedure outlining the steps to assemble the complete detector)
- 09:15, 9 October 2019 Whitey (Talk | contribs) uploaded File:TOF ASSY.jpg
- 11:18, 30 September 2019 Whitey (Talk | contribs) uploaded File:SamtekHV.pdf
- 11:16, 30 September 2019 Whitey (Talk | contribs) uploaded File:Radiall connector.pdf (HV cable connector 48 pin)
- 08:59, 25 September 2019 Whitey (Talk | contribs) uploaded File:TOFII.jpg (progress)
- 08:43, 25 September 2019 Whitey (Talk | contribs) uploaded File:TOF pmt.jpg (upper center pmt mismatch)
- 15:13, 24 September 2019 Whitey (Talk | contribs) uploaded File:1020 shield.pdf (6mm longer shield for module mag field test FCAL insert)
- 15:11, 24 September 2019 Whitey (Talk | contribs) uploaded File:Steel shield.pdf (mag shield box for testing pmts)
- 14:58, 24 September 2019 Whitey (Talk | contribs) uploaded File:Acrylic sheet.pdf (1/2"sheet with bevelled edges)
- 14:14, 19 August 2019 Whitey (Talk | contribs) uploaded File:Particle trajectory through BCAL.pdf (particle trajectory grazing BCAL)