All public logs
From GlueXWiki
Combined display of all available logs of GlueXWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 19:14, 7 March 2023 Ksuresh (Talk | contribs) uploaded a new version of File:MiniBCAL-Scalars-Channel-assignment.jpg
- 19:14, 7 March 2023 Ksuresh (Talk | contribs) uploaded a new version of File:MiniBCAL-Scalars-Channel-assignment.jpg
- 18:59, 7 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-Scalars-Channel-assignment.jpg (The channel assignments and their correspondence to the fADC channels.)
- 16:08, 7 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-Input-Supply.jpeg (BCAL distribution box assignment for mini BCAL)
- 18:14, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-OutputCrate2.jpeg (mini BCAL setup for EIC output crate)
- 18:13, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-OutputCrate1.jpeg (mini BCAL setup for EIC output crate)
- 18:11, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-OutputCrate.jpeg (output fADC crate for mini BCAL for EIC test)
- 18:10, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-Cloth-Wrapping.jpeg (mini BCAL after wrapping black cloth for darkening)
- 18:08, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-Tedlar-Wrapped.jpeg (miniBCAL wrapped in Black Tedlar for darkening)
- 18:02, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-North.jpeg (mini BCAL setup North end after output cabling)
- 18:01, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-South.jpeg (miniBCAL setup of the south end after attaching output cable)
- 17:24, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-TopView.jpeg (Top View of the mini BCAL setup at Hall-D in EIC test March 3 2023)
- 17:22, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-UpstreamView.jpeg.jpeg (UpStream View of the mini BCAL setup at Hall-D for EIC test March 6th 2023)
- 17:21, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-DownstreamView.jpeg (Downstream view of the mini BCAL setup at HallD for the EIC tests March 6 2023)
- 17:17, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-Cable-Rack.jpeg (Rack along which the mini BCAL output cables are stretched.)
- 17:13, 6 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-EIC-Cable-Stretching.jpeg (miniBCAL cable stretching for the EIC Tests 6th March 2023)
- 19:44, 5 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-LEMO-Labels2.jpeg (Labelling of LEMO cables for mini BCAL)
- 19:42, 5 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-LEMO-Labels.jpeg (labelling of the LEMO cables for the mini BCAL setup)
- 19:28, 5 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-BottomWaveguide-black-tedlar.jpeg (Bottom Waveguides wrapped in black tedlar)
- 19:26, 5 March 2023 Ksuresh (Talk | contribs) uploaded File:MiniBCAL-TopWaveguide-black-tedlar.jpeg (mini BCAL Wrapping of top Waveguides using black tedlar)