Difference between revisions of "Solenoid Controls Redesign"

From GlueXWiki
Jump to: navigation, search
m
 
(41 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
'''To-do for solenoid controls redesign'''
 
'''To-do for solenoid controls redesign'''
 +
 +
 +
'''Obsolete...replaced by Fastrack schedule'''
 +
 +
 +
* Recommendations from Director's Review (Electrical System and Quench Protection) and Lehman Review
 +
** determine if cold diodes can increase quench detection - '''No, Nov-2011'''
 +
** add fast DAQ system prior to testing first coil - '''Done'''
 +
** add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
 +
** add second dump circuit breaker - '''Not needed, Mar-2012'''
 +
** add additional quench circuit diodes - '''Not needed, Mar-2012'''
 +
** add second quench detector - '''PLC adequate as redundant QD - Mar 2012'''
 +
** add center tap to dump resistor and monitor ground current in the PLC
 +
** add UPS on dump breakers to avoid fast discharges
 +
** perform Failure Modes and Effects Analysis (FMEA)
 +
 +
 +
 +
* Logbook research
 +
** check elog for all problems - '''Done Mar-2012'''
 +
 +
 +
 +
* Infrastructure
 +
** get fourth rack - '''Done Nov 2011'''
 +
** connect fourth rack to other three racks
 +
** procure and install computer in racks
 +
 +
 +
 +
* Cryo system
 +
** need specs, new channels, new functionality, etc. from Jonathan - '''Done Dec 2011'''
 +
** complete P&I diagram
 +
** update mechanical/electrical interface drawing
 +
 +
 +
 +
* Vacuum system
 +
** design and create drawings
 +
** purchase and implement vacuum control system
 +
  
  
 
* Wiring
 
* Wiring
 +
** add new equipment, modify for PXI system
 
** document trip chains
 
** document trip chains
 
** label circuit breakers
 
** label circuit breakers
** use Sequence-Of-Events (SOE) module, need additional wiring and relays
+
** design and implement SOE circuits, need additional wiring and relays
** cross-talk on voltage tap channels
+
*** prototype use of SOE module and relays in controls test stand - '''Done Dec-2011'''
*** change connection scheme?
+
** identify and connect to internal power supply trip chains where feasible
*** change current limiting scheme?
+
** improve voltage range and eliminate cross-talk on voltage tap channels '''Done Mar-2012 use PXI system'''
*** use local measurement and current-loop to bring it down?
+
** extend voltage measurement range using attenuators on separate Dataforth/PLC channels
+
** should we use high-bandwidth Dataforth modules?
+
** should we monitor all relays?
+
  
  
  
 
* Danfysik power supply
 
* Danfysik power supply
** do we want to go to Ethernet based control?
+
** implement dump resistor center-tap ground fault detector
** choose ground fault detection mechanism
+
** lockbox for door key  
** address committee concerns
+
** lock/tag/try procedures for dump resistor
*** dual fast dump switches?
+
** procedures to check for dump resistor integrity and diode polarity prior to startup
*** other redundancies?
+
** bring Danfysik techs out to upgrade/refurbish all old Danfysik supplies
*** UPS on control boards and contactor?
+
** do we have enough redundancy on overcurrent protection?
** lockbox for key
+
*** Do we need shunt?  can we use zfct for redundancy?  use flux sensor?
** lock/tag/try for dump resistor
+
** procedures to check for dump resistor integrity and diode polarity
+
 
+
  
  
 
* Quench detector
 
* Quench detector
** can we get a good balance?
+
** need sub-coil inductances from Floyd/George - '''Done Dec-2011'''
** need sub-coil inductances in proper order
+
** modify QD for final configuration
** do we need to design our own QD?
+
*** test imbalance range adjustment in lab '''Done Nov-2012'''
  
  
  
 
* Instrumentation
 
* Instrumentation
** implement system to isolate fault detectors and determine time sequence of trips
 
** monitor circuit breakers
 
 
** implement RS232 connections to all devices (e.g. vacuum gauges)
 
** implement RS232 connections to all devices (e.g. vacuum gauges)
 +
*** list from Mark - '''Done Dec-2011'''
 +
*** Use RTI 435NBX instead of Point I/O serial modules
 +
**** Check out RS485 instead of RS232
 +
*** Use RTI 490NBX for Ethernet/IP readout
 +
** replace shunt with flux-monitoring sensor '''Done Feb-2012 use CEBAF board readout of ZFCT'''
 +
** design and build breakout box
  
  
  
* VME-based fast DAQ
+
* NI PXI fast DAQ
** NI vs VME?
+
** test PXI system - '''Done Feb-2012'''
 +
** program and connect to PLC, EPICS
  
  
  
* A-B HMI improvements
+
* A-B PLC programming
** fault sequence screens
+
** consider existing program a prototype, rework for 15-20 year lifetime - '''Agreed Nov-2012'''
 +
** send Josh to A-B training - '''Done Jan-2012'''
 +
** use custom ("add-on") instructions to simplify everything
 +
** use function block, structured text and ladder logic as appropriate
 +
** add new channels, modify old ones according to latest channel assignments
 +
*** connect to Cryo PLC via ControlNet
 +
*** SOE module
  
  
  
* A-B PLC program improvements
+
* A-B HMI improvements
** custom ("add-on") instructions to simplify everything
+
** SOE fault sequence screens
 +
** other error screens
 +
** Viewpoint
 +
*** get screens on the web
 +
*** security?
  
  
  
* EPICS
+
* Archiver
** new channels
+
** determine which channels need archiving
 +
** determine role of A-B vs EPICS archiver
  
  
  
* Viewpoint
+
* EWEB
** test
+
** create tag lists
 +
** security?
  
  
  
* EWEB
+
* EPICS
** use just for back-door access
+
** new channels
** security?
+
*** generate channel lists, identify those that should be exposed as EPICS PV's, create EPICS database
  
  
  
 
* UPS power
 
* UPS power
** to where? target?
+
** solenoid controls racks
 +
** Danfysik control circuits and contactor
 +
** target
 +
** other cryo and vacuum systems?
 +
** FDC cooling systems (dewpoint)?
 +
** BCAL readout cooling system (dewpoint)?
 +
** CDC/FDC gas system?
 +
** network switches
 
** downtime due to power loss is deciding factor
 
** downtime due to power loss is deciding factor
  
Line 83: Line 142:
 
'''Notes'''
 
'''Notes'''
 
* max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
 
* max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
 +
 +
 +
 +
'''Possible future improvements'''
 +
* monitor selected circuit breakers so operators can quickly find them when they trip

Latest revision as of 11:11, 15 August 2012

To-do for solenoid controls redesign


Obsolete...replaced by Fastrack schedule


  • Recommendations from Director's Review (Electrical System and Quench Protection) and Lehman Review
    • determine if cold diodes can increase quench detection - No, Nov-2011
    • add fast DAQ system prior to testing first coil - Done
    • add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
    • add second dump circuit breaker - Not needed, Mar-2012
    • add additional quench circuit diodes - Not needed, Mar-2012
    • add second quench detector - PLC adequate as redundant QD - Mar 2012
    • add center tap to dump resistor and monitor ground current in the PLC
    • add UPS on dump breakers to avoid fast discharges
    • perform Failure Modes and Effects Analysis (FMEA)


  • Logbook research
    • check elog for all problems - Done Mar-2012


  • Infrastructure
    • get fourth rack - Done Nov 2011
    • connect fourth rack to other three racks
    • procure and install computer in racks


  • Cryo system
    • need specs, new channels, new functionality, etc. from Jonathan - Done Dec 2011
    • complete P&I diagram
    • update mechanical/electrical interface drawing


  • Vacuum system
    • design and create drawings
    • purchase and implement vacuum control system


  • Wiring
    • add new equipment, modify for PXI system
    • document trip chains
    • label circuit breakers
    • design and implement SOE circuits, need additional wiring and relays
      • prototype use of SOE module and relays in controls test stand - Done Dec-2011
    • identify and connect to internal power supply trip chains where feasible
    • improve voltage range and eliminate cross-talk on voltage tap channels Done Mar-2012 use PXI system


  • Danfysik power supply
    • implement dump resistor center-tap ground fault detector
    • lockbox for door key
    • lock/tag/try procedures for dump resistor
    • procedures to check for dump resistor integrity and diode polarity prior to startup
    • bring Danfysik techs out to upgrade/refurbish all old Danfysik supplies
    • do we have enough redundancy on overcurrent protection?
      • Do we need shunt? can we use zfct for redundancy? use flux sensor?


  • Quench detector
    • need sub-coil inductances from Floyd/George - Done Dec-2011
    • modify QD for final configuration
      • test imbalance range adjustment in lab Done Nov-2012


  • Instrumentation
    • implement RS232 connections to all devices (e.g. vacuum gauges)
      • list from Mark - Done Dec-2011
      • Use RTI 435NBX instead of Point I/O serial modules
        • Check out RS485 instead of RS232
      • Use RTI 490NBX for Ethernet/IP readout
    • replace shunt with flux-monitoring sensor Done Feb-2012 use CEBAF board readout of ZFCT
    • design and build breakout box


  • NI PXI fast DAQ
    • test PXI system - Done Feb-2012
    • program and connect to PLC, EPICS


  • A-B PLC programming
    • consider existing program a prototype, rework for 15-20 year lifetime - Agreed Nov-2012
    • send Josh to A-B training - Done Jan-2012
    • use custom ("add-on") instructions to simplify everything
    • use function block, structured text and ladder logic as appropriate
    • add new channels, modify old ones according to latest channel assignments
      • connect to Cryo PLC via ControlNet
      • SOE module


  • A-B HMI improvements
    • SOE fault sequence screens
    • other error screens
    • Viewpoint
      • get screens on the web
      • security?


  • Archiver
    • determine which channels need archiving
    • determine role of A-B vs EPICS archiver


  • EWEB
    • create tag lists
    • security?


  • EPICS
    • new channels
      • generate channel lists, identify those that should be exposed as EPICS PV's, create EPICS database


  • UPS power
    • solenoid controls racks
    • Danfysik control circuits and contactor
    • target
    • other cryo and vacuum systems?
    • FDC cooling systems (dewpoint)?
    • BCAL readout cooling system (dewpoint)?
    • CDC/FDC gas system?
    • network switches
    • downtime due to power loss is deciding factor



Notes

  • max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec


Possible future improvements

  • monitor selected circuit breakers so operators can quickly find them when they trip