Difference between revisions of "Solenoid Controls Redesign"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
** add fast DAQ system prior to testing first coil - '''Done'''
 
** add fast DAQ system prior to testing first coil - '''Done'''
 
** add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
 
** add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
** add second dump circuit breaker
+
** add second dump circuit breaker - '''NO, Mar-2012'''
** add additional quench circuit diodes
+
** add additional quench circuit diodes - '''NO, Mar-2012'''
** add second quench detector (connected to second dump breaker)
+
** add second quench detector (connected to second dump breaker) - '''PLC adequate as redundant QD - Mar 2012'''
 
** add center tap to dump resistor and monitor ground current in the PLC
 
** add center tap to dump resistor and monitor ground current in the PLC
 
** add UPS on dump breakers to avoid fast discharges
 
** add UPS on dump breakers to avoid fast discharges
Line 16: Line 16:
  
 
* Logbook research
 
* Logbook research
** check elog for all problems
+
** check elog for all problems - '''Done Mar-2012'''
  
  
  
 
* Infrastructure
 
* Infrastructure
** get fourth rack, install temporary wheels, bolt to other three racks
+
** get fourth rack, install temporary wheels, bolt to other three racks - '''Done Nov 2011'''
 
** install computer and other equipment
 
** install computer and other equipment
  
Line 39: Line 39:
 
*** prototype use of SOE module and relays in controls test stand - '''Done Dec-2011'''
 
*** prototype use of SOE module and relays in controls test stand - '''Done Dec-2011'''
 
*** connect to internal power supply trip chains when feasible
 
*** connect to internal power supply trip chains when feasible
** improve voltage range and eliminate cross-talk on voltage tap channels
+
** improve voltage range and eliminate cross-talk on voltage tap channels '''Done Mar-2012 use PXI system'''
*** change connection scheme?
+
 
*** change current limiting scheme?
+
*** requirements:  fast vs slow, high vs low voltage, high vs low precision
+
*** 17+ voltage taps, at least two connections/tap, sometimes three
+
  
  
Line 57: Line 54:
 
** need sub-coil inductances from Floyd/George - '''Done Dec-2011'''
 
** need sub-coil inductances from Floyd/George - '''Done Dec-2011'''
 
** modify QD for final configuration
 
** modify QD for final configuration
*** test imbalance range adjustment in lab
+
*** test imbalance range adjustment in lab '''Done Nov-2012'''
** do we need a second QD?  second technology?  do we need to design our own?  use PLC?
+
  
  
Line 66: Line 62:
 
*** list from Mark - '''Done Dec-2011'''
 
*** list from Mark - '''Done Dec-2011'''
 
*** Use RTI 435NBX instead of Point I/O serial modules
 
*** Use RTI 435NBX instead of Point I/O serial modules
** Replace shunt with flux-monitoring sensor
+
*** Use RTI 490NBX for Ethernet/IP readout
 +
** replace shunt with flux-monitoring sensor '''Done Feb-2012 use CEBAF board readout of ZFCT'''
 
** design and build breakout box
 
** design and build breakout box
  
  
  
* NI fast DAQ
+
* NI PXI fast DAQ
** test new module
+
** test PXI system - '''Done Feb-2012'''
** purchase three more modules
+
 
** connect to PLC, EPICS
 
** connect to PLC, EPICS
  
Line 80: Line 76:
 
* A-B PLC programming
 
* A-B PLC programming
 
** consider existing program a prototype, rework for 15-20 year lifetime
 
** consider existing program a prototype, rework for 15-20 year lifetime
** send Josh to A-B training - '''Jan-2012'''
+
** send Josh to A-B training - '''Done Jan-2012'''
 
** use custom ("add-on") instructions to simplify everything
 
** use custom ("add-on") instructions to simplify everything
 
** use function block, structured text and ladder logic as appropriate
 
** use function block, structured text and ladder logic as appropriate
 
** add new channels, modify old ones according to latest channel assignments
 
** add new channels, modify old ones according to latest channel assignments
 
*** new cryo channels
 
*** new cryo channels
*** use 435NBX instead of Point I/O modules
+
*** connect to Cryo PLC via ControlNet
*** eliminate ControlNet
+
 
*** SOE module
 
*** SOE module
  
Line 113: Line 108:
 
* UPS power
 
* UPS power
 
** solenoid controls racks
 
** solenoid controls racks
** Danfysik control circuits and contactor?
+
** Danfysik control circuits and contactor
 
** target? other cryo and vacuum systems?
 
** target? other cryo and vacuum systems?
 
** cooling systems (dewpoint)?
 
** cooling systems (dewpoint)?

Revision as of 15:53, 6 April 2012

To-do for solenoid controls redesign


  • Recommendations from Director's Review (Electrical System and Quench Protection) and Lehman Review
    • determine if cold diodes can increase quench detection - NO, Nov-2011
    • add fast DAQ system prior to testing first coil - Done
    • add tests for internal shorts, shorts to ground and ground faults in coil and power supply to start-up sequence
    • add second dump circuit breaker - NO, Mar-2012
    • add additional quench circuit diodes - NO, Mar-2012
    • add second quench detector (connected to second dump breaker) - PLC adequate as redundant QD - Mar 2012
    • add center tap to dump resistor and monitor ground current in the PLC
    • add UPS on dump breakers to avoid fast discharges
    • perform Failure Modes and Effects Analysis (FMEA)


  • Logbook research
    • check elog for all problems - Done Mar-2012


  • Infrastructure
    • get fourth rack, install temporary wheels, bolt to other three racks - Done Nov 2011
    • install computer and other equipment


  • Cryo system
    • need specs, new channels, new functionality, etc. from Jonathan - Done Dec 2011
    • update mechanical/electrical interface drawing


  • Wiring
    • add new equipment
    • document trip chains
    • label circuit breakers
    • implement Sequence-Of-Events (SOE) module, need additional wiring and relays
      • prototype use of SOE module and relays in controls test stand - Done Dec-2011
      • connect to internal power supply trip chains when feasible
    • improve voltage range and eliminate cross-talk on voltage tap channels Done Mar-2012 use PXI system


  • Danfysik power supply
    • implement dump resistor center-tap ground fault detector
    • lockbox for door key
    • lock/tag/try procedures for dump resistor
    • procedures to check for dump resistor integrity and diode polarity prior to startup


  • Quench detector
    • need sub-coil inductances from Floyd/George - Done Dec-2011
    • modify QD for final configuration
      • test imbalance range adjustment in lab Done Nov-2012


  • Instrumentation
    • implement RS232 connections to all devices (e.g. vacuum gauges)
      • list from Mark - Done Dec-2011
      • Use RTI 435NBX instead of Point I/O serial modules
      • Use RTI 490NBX for Ethernet/IP readout
    • replace shunt with flux-monitoring sensor Done Feb-2012 use CEBAF board readout of ZFCT
    • design and build breakout box


  • NI PXI fast DAQ
    • test PXI system - Done Feb-2012
    • connect to PLC, EPICS


  • A-B PLC programming
    • consider existing program a prototype, rework for 15-20 year lifetime
    • send Josh to A-B training - Done Jan-2012
    • use custom ("add-on") instructions to simplify everything
    • use function block, structured text and ladder logic as appropriate
    • add new channels, modify old ones according to latest channel assignments
      • new cryo channels
      • connect to Cryo PLC via ControlNet
      • SOE module


  • A-B HMI improvements
    • SOE fault sequence screens
    • other error screens
    • Viewpoint
      • get screens on the web
      • security?


  • EWEB
    • create tag lists
    • security?


  • EPICS
    • new channels


  • UPS power
    • solenoid controls racks
    • Danfysik control circuits and contactor
    • target? other cryo and vacuum systems?
    • cooling systems (dewpoint)?
    • downtime due to power loss is deciding factor



Notes

  • max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec


Possible future improvements

  • monitor selected circuit breakers so operators can quickly find them when they trip